My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
04-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 4:14:40 PM
Creation date
4/18/2019 4:08:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />April 11, 2019 <br />Via Email Only: spolka@cityofardenhills.org <br /> <br /> <br />Ms. Sue Polka, PE <br />Public Works Director/City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, Minnesota 55112 <br /> <br /> <br />Re: Proposal for Engineering Services <br /> Construction Administration for Watermain Relocation <br /> <br /> <br />Dear Ms. Polka: <br /> <br />In response to your request, we propose to provide Engineering Services in connection with watermain <br />relocation as a part of MnDOT’s two lane exit project at Highway 10 and Interstate 35W. Our services <br />will be provided in the manner described in this Proposal subject to the terms and conditions set forth in <br />our “General Provisions of Engineer-Architect Agreement” dated July 2009. Hereinafter, the City of <br />Arden Hills is referred to as CLIENT. <br /> <br />I. PROJECT DESCRIPTION <br /> <br />MnDOT is planning for a two lane exit, an auxiliary lane, and noise walls on Highway 10 and Interstate <br />35W. City watermain is in close proximity to the proposed noise wall and has a history of corrosion and <br />breaks. The construction activity could cause additional watermain breaks due to the age and condition <br />of the watermain. Approximately 1,500 feet of watermain is proposed to be replaced on the south side <br />of Highway 10 between Interstate 35W and County State Aid Highway 96. TKDA completed the <br />engineering drawings for this work. <br /> <br />II. SERVICES TO BE PROVIDED BY TKDA <br /> <br />Based on TKDA’s understanding of the Project, we propose to provide the following services: <br /> <br />A. CONSTRUCTION ADMINISTRATION <br />Provide general construction administration including the following: responses to requests for <br />information, field check ins, attending up to two project meetings, preparing project <br />documentation, as well as completion of as-built drawings for the watermain work. <br /> <br />III. ADDITIONAL SERVICES <br /> <br />If authorized in writing by the CLIENT, we will furnish or obtain from others Additional Services of the <br />types listed below which are not considered as basic services under this Proposal. Additional Services
The URL can be used to link to this page
Your browser does not support the video tag.