Laserfiche WebLink
8 <br />9 <br />1SAFE 48"A3352.1342KD~HF~5E~06A3352.1342KD~HF~5E~06A3352.1342KD~HF~5E~06A3352.1342KD~HF~5E~06BP-01 <br />BP-05 <br />NO WORK <br />BP-02 <br />SEE MECHANICAL FOR BP-01 <br />CEILING WORK IN THIS ZONE <br />BP-03 <br />BP-03 <br />BP-03 <br />BP-02 <br />BP-04 <br />BP-02 ALTERNATE 1: <br />GREENHOUSE & <br />HEADHOUSE <br />BP-04 <br />BP-01 <br />BP-02 <br />NO WORK <br />BP-04 <br />BP-01 BP-03 BP-03 <br />BP-03 <br />BP-02 <br />BP-01- SEE MECHANICAL <br />AND STRUCTURAL FOR <br />MORE INFO <br />SEE MECHANICAL FOR SCOPE AND <br />INCIDENTAL WORK THIS AREA <br />BP-02 ALTERNATE 1: <br />GREENHOUSE & <br />HEADHOUSE <br />PHASING LEGEND <br />BID PACK 01 <br />BID PACK 02 <br />BID PACK 03 <br />BID PACK 04 <br />BID PACK 05 <br />2007 <br />BRUSHABER <br />COMMONS <br />(BC) <br />1972 <br />ACADEMIC CENTER <br />(AC)1993 <br />CAMPUS LIFE CENTER <br />(CLC)1972 <br />CLAUSON CENTER <br />(CC) <br />SCIENCES ADDITION <br />1FL: 1998 IN FILL <br />"SLIVER" <br />2, 3FL: 2007 BRUSHABER <br />2010 INFILL <br />"SLIVER"1980 <br />ADDITION <br />ACADEMIC COMMONS <br />1993 <br />GREAT HALL <br />GREENHOUSE <br />ADDITION <br />BP-02 BP-01, BP-04, BP-05 <br />RENOVATION <br />BP-04 <br />BP-01 AND BP-04 <br />BP-05 <br />BP-02 <br />BP-02 <br />BP-02 <br />FIRST LEVEL <br />100'-0" <br />SECOND LEVEL <br />113'-6 5/8" <br />THIRD LEVEL <br />127'-1 1/4" <br />ROOF LEVEL - ADDITION <br />141'-1 1/4" <br />ROOF LEVEL - EXISTING <br />140'-5 1/4" <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />1 2 3 4 5 6 7 <br />H <br />G <br />F <br />E <br />D <br />7654321 Copyright BWBRI hereby certify that this plan, specification or report was prepared <br />by me or under my direct supervision and that I am a duly <br />Licensed Architect under the laws of the State of Minnesota. <br />Name <br />Date Reg. No. <br />DateItem <br />Sheet No. <br />Sheet Title <br />Comm. No.Drawn <br />This Sheet may be <br />a Reduced Copy. <br />The bar above is 1" long on a Full Size Sheet. <br />Drawing Scales apply to Full Size Sheets. <br />This document may be an electronic file or <br />may be printed from an electronic file <br />provided to the user. It is the sole <br />responsibility of the user to ensure that the <br />content and quality is consistent with the <br />content and quality of the original documents <br />on file at BWBR. <br />C <br />B <br />A <br />Issued For <br />Consultants <br />651.222.3701 <br />Saint Paul, MN 55102 <br />380 St. Peter Street, Ste. 600 <br />bwbr.com <br />BETHEL <br />UNIVERSITY <br />Sciences <br />Renovation and <br />Addition <br />Keyplan <br />PLAN <br />NORTH <br />TRUE <br />NORTHFOR REFEREN CE O N LY3/27/2019 4:23:01 PMBWL <br />PHASING PLAN <br />100.P <br />3.2017077.14 <br />03/27/2019 <br />3/64" = 1'-0"1D ACADEMIC COMMONS (AC) BUILDING FIRST LEVEL "AC1" & CLAUSEN CENTER FIRST LEVEL "CC1" <br />3/64" = 1'-0" <br />ACADEMIC COMMONS (AC) BUILDING THIRD LEVEL "AC3"3H <br />3/64" = 1'-0"5D ACADEMIC COMMONS (AC) BUILDING SECOND LEVEL "AC2" & CLAUSEN CENTER SECOND LEVEL "CC2" <br />3/64" = 1'-0" <br />ACADEMIC COMMONS (AC) BUILDING ROOF "AC-R"6H1" = 50'-0" <br />REFERENCE PLAN1H <br />3/4" = 1'-0"2E PHASING DIAGRAM - AC BUILDING AND ADDITION SECTION <br />DD ISSUE 10/17/2018 <br />DD AD-1 10/25/2018 <br />PRICING SET ISSUE 02/20/2019 <br />BP-01 CD ISSUE 03/27/2019NOT FO <br />R <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N