Laserfiche WebLink
H <br />8 <br />9 <br />J I <br />1 <br />J.5 H.8 H.2 <br />UNIT 18 <br />SAFE120AELEC.120D& REPAIRCOMP. STOR.120BOFFICE120COFFICEXXXSTAIR125CLASSROOM122CUS.123EQUIP.ELEV.121ELEV.120LABCOMPUTER100BCLAY STOR.100ASTOR.DAMP RMXXXSTAIR100CERAMIC STUDIO101KILN RMXXXSTAIR131SCREEN PRINTINGSTUDIO/130& 3D DESIGNSTUDIO/SCULPTURE103OFFICE102SCULPTURAL STUDIO129WOOD SHOPSTUDIO/148WOMEN'S123 <br />SOUTH ENTRY <br />122 <br />SOUTH LOBBY <br />124 <br />LOGGIA <br />137 <br />CORR./STOR. <br />151 <br />LOADING DOCK <br />155 <br />BOILER RM <br />157 <br />STOR. <br />BACKSTAGE <br />148 <br />CLASSR00M <br />150 <br />STOR.140 <br />CORR. <br />138 <br />STOR. CLOSET <br />STAIR #5/ <br />139 <br />CUST. <br />136 <br />CORR. <br />153 <br />GREENHOUSE <br />162 <br />CORR. <br />163 <br />CORR. <br />127 <br />STOR. <br />126 <br />STAIR #4 <br />129 <br />ROOM/OFFICE <br />CONTROL <br />159B <br />MEZZANINE <br />159 <br />ORCHESTRA <br />158 <br />STAGE <br />159C <br />TERRACE SOUTH <br />154 <br />MECH. RM <br />ELEV. <br />161 <br />CORR. <br />128 <br />ENTRANCE <br />MEZZANINE <br />XX <br />ELEV. <br />156 <br />ROOM <br />FIRE PUMP <br />160 <br />STAIR #6 <br />120A <br />ELEC.120BOFFICE122 <br />CUS. <br />123 <br />EQUIP. <br />ELEV.121ELEV.1239 SQ.FT.120CLASSROOM125CLASSROOM103OFFICE102SCULPTURAL STUDIO120AELEC.120D& REPAIRCOMP. STOR.120BOFFICE120COFFICEXXXSTAIR122CUS.123EQUIP.ELEV.121ELEV.120LABCOMPUTER113OFFICE111CUST.109MECH.110ELEC.105BSTOR.105AOFFICE100BCLAY STOR.100ASTOR.DAMP RMXXXSTAIR100CERAMIC STUDIO101KILN RMXXXSTAIR105CCUS.106RESTROOMART131SCREEN PRINTINGSTUDIO/130& 3D DESIGNSTUDIO/SCULPTURE129WOOD SHOPSTUDIO/120A <br />ELEC.120BOFFICE122 <br />CUS. <br />123 <br />EQUIP. <br />ELEV.121ELEV.1239 SQ.FT.120CLASSROOMSTAIR <br />XXX <br />SPACE UNASSIGNED <br />113D <br />SPACE UNASSIGNED <br />113E <br />STAIR <br />XXX <br />UP <br />UP <br />UP <br />DN <br />UPSLOPE DOWN <br />SLOPE DOWN <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />UP <br />DN <br />ED <br />EXEXED <br />ED <br />EX <br />EX <br />EX <br />ED <br />EX <br />EX <br />EX <br />EGRESS PATH CONTINUES <br />IN CC BUILDING AND TO HC <br />BUILDING <br />EX <br />HE <br />HE <br />CLC AC/BC/CC <br />AC/BC/CC <br />CLC <br />EX <br />ED <br />EX <br />ED <br />EAEA <br />24 OCC 20 OCC 20 OCC <br />EA EA EA EA <br />25 OCC <br />60' EXISTING DEAD END < 70' - OK PER MNCC 805.6, EX 3 <br />EXISTING INTERIOR EXIT STAIR <br />DISCHARGE NOT ALTERED BY <br />PROJECT <br />EA <br />EA <br />AC-177 <br />GEN BIOLOGY LAB <br />1 <br />AC-175 <br />GEN BIOLOGY LAB <br />2 <br />AC-173 <br />ENDOCRINOLOGY <br />/ PHYSIOLOGY LAB AC-171 <br />MICROBIOLOGY <br />LAB <br />AC-169 <br />MICROBIOLOGY <br />PREP ROOM <br />AC-174E <br />PROCEDURE <br />AC-174A <br />ENVIRONMENTAL <br />CHAMBERS <br />AC-180 <br />MAIN ELECTRICAL <br />ROOM <br />AC-174 <br />BIOLOGY <br />RESEARCH LAB 1 <br />AC-155 <br />SERVERAC-151 <br />BIOLOGY <br />RESEARCH LAB 2 <br />AC-150 <br />CONFERENCE <br />ROOM 1 <br />AC-140J <br />ADJUNCT <br />AC-140H <br />OFFICE AC-140L <br />OFFICE <br />AC-140C <br />OFFICE <br />AC-140G <br />OFFICE <br />AC-140F <br />OFFICE <br />AC-140E <br />OFFICE <br />AC-140D <br />OFFICE <br />AC-140P <br />OFFICE <br />AC-140N <br />OFFICE <br />AC-140M <br />OFFICE <br />AC-140Q <br />OFFICEAC-140A <br />OFFICE <br />AC-140B <br />OFFICE <br />AC-142 <br />MECH <br />AC-141 <br />ANATOMY & <br />PHYSIOLOGY LAB2 <br />21 OCC <br />18 OCC <br />AC-174B <br />STORAGE <br />AC-174C <br />ALCOVE <br />AC-174D <br />TISSUE <br />1 OCC 1 OCC 1 OCC 2 OCC <br />11 OCC <br />1 OCC <br />5 OCC <br />18 OCC <br />EA <br />20 OCC <br />EA231' DIAGONAL D97' >1/3x231' D IA G O N A L D -O K <br />EA EA EA EA EA EAEAEA <br />EA <br />CONTROL AREA <br />CLC 1A <br />EA <br />EA <br />FIELD VERIFY EXISTING <br />DOOR RATING <br />CONTROL AREA <br />AC/BC 1A <br />AC-139A <br />SEATING <br />AC-154 <br />DATA <br />EX <br />AC-165 <br />NEUROSCIENCE <br />LAB <br />AC-159 <br />NEUROSCIENCE <br />LAB <br />XXX <br />CORRIDOR <br />AC-164 <br />EQUIPMENT <br />STORAGE <br />AC-158 <br />STORAGE/ MECH. <br />AC-287 <br />Room <br />AC-166 <br />NEUROSCIENCE <br />RESEARCH <br />CC-106 <br />OFFICE SUITE <br />CC-112 <br />OFFICE SUITE <br />CC-104 <br />OFFICE SUITE <br />EA <br /><10' is 1HR <br />AC-184 <br />ELEV. <br />AC-186 <br />ELEV. EQUIP. <br />AC-188 <br />MECH. <br />AC-190 <br />STAIR <br />AC-192 <br />VESTIBULE <br />AC-195 <br />ECOLOGY/ENVIRO. <br />LAB 1 <br />AC-183 <br />ECOLOGY/ENVIRO. <br />LAB 2 <br />renovation in this <br />area in future <br />Phases still being <br />designed <br />renovation in this <br />area in future <br />Phases still being <br />designed <br />renovation in this <br />area in future <br />Phases still being <br />designed <br />26 OCC <br />9 OCC <br />8 OCC <br />1 OCC <br />AC/BC/CC <br />AC/BC/CC <br />EX <br />ED <br />EX <br />ED <br />PEDESTRIAN <br />WAY TUNNEL <br />OPEN <br />STAIR <br />HE <br />AC-191 <br />SOILS RESEARCH <br />AC-193 <br />PREP <br />AC-191A <br />MECH. <br />AC-162 <br />HUDDLE <br />AC-162A <br />ELEC <br />160 <br />STAIR <br />STANDPIPE <br />STANDPIPE SERVING THIS SIDE OF H <br />EXIT LOCATED IN STAIR <br />APPROXIMATE FLOOR <br />OCCUPANT LOAD <br />890 OCCUPANTS <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EX <br />EX <br />ED <br />ED <br />EDEX <br />EX <br />ED <br />GRAND TOTAL OCCUPANT LOAD <br />FIRST FLOOR CLC INCLUDING ADDITION <br />1261 EXISTING OCCUPANTS <br />(630 MAIN EXIT, 315 SIDE EXIT 1, 315 SIDE EXIT 2) <br />68 NEW OCCUPANTS <br />1329 TOTAL OCCUPANTS <br />4 MOE REQ'D <br />8 PROVIDED <br />(OCCUPANTS OF ADDITION ARE CALCULATED TO <br />EXIT INDEPENDENT OF EXISTING BUILIDNG) <br />APPROXIMATE LOBBY <br />OCCUPANT LOAD <br />371 OCCUPANTS <br />MAIN EXIT <br />630 OCCUPANTS <br />DOOR - 630 X 0.2 = 126.00'' <br />320.00'' PROVIDED <br />SIDE EXIT 1 <br />315 OCCUPANTS <br />DOOR - 315 X 0.2 = 63.00'' <br />224.00'' PROVIDED <br />SIDE EXIT 2 <br />315 OCCUPANTS <br />DOOR - 315 X 0.2 = 63.00'' <br />224.00'' PROVIDED <br />THIS PAIR OF DOORS <br />PROVIDES ADDITIONAL <br />CAPACITY FOR THE EXISTING <br />BUILDIING WHICH IS NOT <br />REQUIRED FOR EGRESS - NO <br />OCCUPANT LOAD HAS BEEN <br />ASSIGNED TO THESE DOORS <br />34 OCCUPANTS <br />DOOR - 34 X .2 = 6.80'' <br />34 OCCUPANTS <br />DOOR - 34 X .2 = 6.80'' <br />34 OCCUPANTS <br />DOOR - 34 X .2 = 6.80'' <br />NOYES <br />NOYES <br />GENERAL TYPE OF PROJECT <br />ALLOWABLE (from above)ACTUAL <br />IBC (Chapter 6) <br />(Section 707) <br />(IBC CH 3 & 4) <br />TOTAL <br />CHANGE OF OCCUPANCY? <br />REMODEL <br />ADDITION <br />NEW BUILDING <br />A-2, A-3, B, M <br />PROJECT DESCRIPTION CODE SUMMARY - AC / Brushauber <br />Commons / Clausen Center <br />(AC/BC/CC) <br />SEPARATED OCCUPANCIES? <br />AREA SEPARATIONS / FIRE WALLS <br />FIRE BARRIER RATING(S)SEE CODE PLANS <br />OCCUPANCY CLASSIFICATION(S) <br />TYPE(S) OF CONSTRUCTION <br />ACTUAL AREA PER FLOOR <br />OCCUPANCIES <br />CONSTRUCTION TYPE(S) <br />SECOND FLOOR <br />FIRST FLOOR <br />Bethel University plans to renovate (3) levels (45,000 square feet) of <br />existing space within the Academic Commons (AC) building to support <br />expanding science programs. An additional 3-story, 20,000 square foot <br />addition to the adjacent Campus Life Center (CLC) is also planned to <br />support science programs. The renovation and addition will include labs, <br />classrooms, offices, and support spaces for Biology, Physics & <br />Engineering, Math & Computer Science, Chemistry, and Psychology. <br />(If Remodeling) <br />(IBC Section 508) <br />SEE CODE PLANS <br />NOYESAUTHORITIES HAVING JURISDICTION (AHJ's) <br />DEPARTMENT OF HEALTH (DOH) <br />CITY OF ARDEN HILLS, MN <br />STATE OF MINNESOTA <br />THE JOINT COMMISSION (TJC) <br />CENTER FOR MEDICARE/MEDICAID SERVICES (CMS) <br />AREAS OF REFUGE REQUIRED <br />EGRESS <br />EXISTING UL <br />UL <br />UL <br />NOYES <br />ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED <br />ELEVATOR REQUIRED AS MEANS OF EGRESS <br />(LSC CH 12-42) <br />APPLICABLE REGULATIONS <br />MN STATE RULES <br />2010 FGI GUIDELINES <br />2000 NFPA 101 (LIFE SAFETY CODE) <br />ADAAG <br />ANSI A117.1 '09 <br />2012 IBC / 2015 MN STATE BUILDING CODE <br />MN ACC CODE '15 <br />NOYES <br />I-B <br />NOYES <br />ALLOWABLE HEIGHTACTUAL HEIGHT <br />(504.2) <br />(Table 601, footnote d) <br />(Table 503) <br />(Table 503) <br />ONE HOUR SPRINKLER SUBST <br />EXTRA FLOOR/HEIGHT FOR SPRINKLER <br />160' + 20' = 180' <br />STORIES <br />FEET <br />BUILDING HEIGHT <br />11 + 1 = 12 <br />60' <br />4 <br />PLUMBING FIXTURES <br />ALLOWABLE AREA PER FLOOR <br />TOTAL ALLOWABLE AREA/FLOOR <br />BASIC ALLOWABLE AREA UL <br />UL <br />TESTRATING (HRS) <br />(IBC Table 602 and Section 602.4.6) <br />(Table 602 and Table 705.8) <br />(707.3) <br />(TABLE 601) <br />EXTERIOR DOORS AND WINDOWS <br />SHAFTS AND EXIT PASSAGEWAYS <br />OTHER <br />ROOF CONSTRUCTION <br />PRIME & SEC. FLOOR BEAMS, JOISTS <br />FLOOR/CEILING ASSEMBLY <br />FLOOR CONSTRUCTION <br />INTERIOR <br />NON-BEARING WALLS AND PARTITIONS <br />BEARING WALLS <br />COLUMNS <br />ROOF/CEILING ASSEMBLY <br />PRIME & SEC. ROOF BEAMS, JOISTS <br />EXTERIOR <br />INTERIOR BEARING WALLS <br />EXTERIOR BEARING WALLS <br />STRUCTURAL FRAME <br />FIRE-RESISTIVE REQUIREMENTS <br />See Code Plans <br />2 HOUR <br />2 HOUR <br />0 HOUR <br />2 HOUR <br />2 HOUR <br />1 HOUR <br />1 HOUR <br />0 HOUR <br />NOYES <br />(IBC 407.3) <br />FIRE RESISTIVE CORRIDORS? <br />SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS) <br />INCIDENTAL USE AREA RATING(S)SEE PLANS <br />MISCELLANEOUS <br />(IBC Table 1018.1) <br />ROOMS (UNO)CORRIDORS <br />OCCUPANCY <br />A-2, A-3 <br />EXITS <br />(Table 803.9 & Section 804) <br />* Not applicable to non-fibrous flooring materials <br />** Class C materials permitted in administrative spaces and other spaces w/ capacity of ≤ 4 occupants <br />Walls & Ceilings Flooring* <br />B <br />Walls & Ceilings <br />C <br />Walls & CeilingsFlooring*Flooring* <br />DOC-FF-1 DOC-FF-1 <br />B, M C CDOC-FF-1 DOC-FF-1 <br />INTERIOR FINISHES CLASSIFICATION <br />RECYCLING SPACE (MN only)BUILDING AREA NOT ALTERED <br />THIRD FLOOR UL <br />2 HOUR <br />NOYESGENERAL TYPE OF PROJECT <br />ALLOWABLE (from above)ACTUAL <br />IBC (Chapter 6) <br />TOTAL <br />REMODEL <br />ADDITION <br />NEW BUILDING <br />AREA SEPARATIONS / FIRE WALLS <br />TYPE(S) OF CONSTRUCTION <br />ACTUAL AREA PER FLOOR <br />CONSTRUCTION TYPE(S) <br />SECOND FLOOR <br />FIRST FLOOR <br />SEE CODE PLANS <br />NOYESAUTHORITIES HAVING JURISDICTION (AHJ's) <br />DEPARTMENT OF HEALTH (DOH) <br />CITY OF ARDEN HILLS, MN <br />STATE OF MINNESOTA <br />THE JOINT COMMISSION (TJC) <br />CENTER FOR MEDICARE/MEDICAID SERVICES (CMS) <br />AREAS OF REFUGE REQUIRED <br />EGRESS <br />41,720 <br />41,720 <br />92,190 <br />54,250 <br />54,250 <br />54,250 x 3 = 162,750 <br />NOYES <br />ACCESSIBLE MEANS OF EGRESS REQUIRED (from addition) <br />ELEVATOR REQUIRED AS MEANS OF EGRESS <br />APPLICABLE REGULATIONS <br />MN STATE RULES <br />2010 FGI GUIDELINES <br />2000 NFPA 101 (LIFE SAFETY CODE) <br />ADAAG <br />ANSI A117.1 '09 <br />2012 IBC / 2015 MN STATE BUILDING CODE <br />MN ACC CODE '15 <br />NOYES <br />II-A <br />NOYES <br />ALLOWABLE HEIGHTACTUAL HEIGHT <br />(504.2) <br />(Table 601, footnote d) <br />(Table 503) <br />(Table 503) <br />ONE HOUR SPRINKLER SUBST <br />EXTRA FLOOR/HEIGHT FOR SPRINKLER <br />65' + 20' = 85' <br />STORIES <br />FEET <br />BUILDING HEIGHT <br />3 + 1 = 4 <br />79'-9" <br />4 <br />(Choose One) <br />OR USE <br />YES NO <br />(1 HOUR CONSTRUCTION SUBST) <br />(MULTIPLE STORY BUILDING) <br />(SINGLE STORY BUILDING) <br />Perimeter with > 30'-0" open <br />Total perimeter 0.25 X BASIC ALLOWABLE <br />W <br />30 <br />- 0.25 <br />P <br />F <br />fI = 100 <br />BASIC ALLOWABLE AREA x 0 <br />BASIC ALLOWABLE AREA x 2 <br />BASIC ALLOWABLE AREA x 3 <br />ALLOWABLE AREA PER FLOOR <br />TOTAL ALLOWABLE AREA/FLOOR <br />SPRINKLER INCREASE <br />BASIC ALLOWABLE AREA <br />FRONTAGE INCREASE <br />Assume all A-1 = 15,500 <br />7,750 <br />31,000 <br />54,250 <br />TESTRATING (HRS) <br />(TABLE 601) <br />EXTERIOR DOORS AND WINDOWS <br />SHAFTS AND EXIT PASSAGEWAYS <br />OTHER <br />ROOF CONSTRUCTION <br />PRIME & SEC. FLOOR BEAMS, JOISTS <br />FLOOR/CEILING ASSEMBLY <br />FLOOR CONSTRUCTION <br />INTERIOR <br />NON-BEARING WALLS AND PARTITIONS <br />BEARING WALLS <br />COLUMNS <br />ROOF/CEILING ASSEMBLY <br />PRIME & SEC. ROOF BEAMS, JOISTS <br />EXTERIOR <br />INTERIOR BEARING WALLS <br />EXTERIOR BEARING WALLS <br />STRUCTURAL FRAME <br />FIRE-RESISTIVE REQUIREMENTS <br />See Code Plans <br />1 HOUR <br />1 HOUR <br />0 HOUR <br />1 HOUR <br />1 HOUR <br />1 HOUR <br />1 HOUR <br />0 HOUR <br />NOYES <br />(IBC 407.3) <br />FIRE RESISTIVE CORRIDORS? <br />SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS) <br />INCIDENTAL USE AREA RATING(S)SEE PLANS <br />MISCELLANEOUS <br />(IBC Table 1018.1) <br />ROOMS (UNO)CORRIDORS <br />OCCUPANCY <br />A-1, A-2 <br />EXITS <br />B <br />(Table 803.9 & Section 804) <br />* Not applicable to non-fibrous flooring materials <br />** Class C materials permitted in administrative spaces and other spaces w/ capacity of ≤ 4 occupants <br />Walls & Ceilings Flooring* <br />B <br />Walls & Ceilings <br />C <br />Walls & CeilingsFlooring*Flooring* <br />DOC-FF-1 DOC-FF-1 <br />B B C CDOC-FF-1 DOC-FF-1 <br />INTERIOR FINISHES CLASSIFICATION <br />RECYCLING SPACE (MN only)18,990 X .0025 = 47 SF REQ'D <br />THIRD FLOOR 8,750 54,250 <br />1 HOUR <br />CODE SUMMARY - CLC / Science <br />Building (CLC) <br />(LSC CH 12-42)NOYES <br />(Section 707) <br />(IBC CH 3 & 4) <br />CHANGE OF OCCUPANCY? <br />A-1, A-2, B <br />SEPARATED OCCUPANCIES? <br />FIRE BARRIER RATING(S) SEE CODE PLANS <br />OCCUPANCY CLASSIFICATION(S) <br />OCCUPANCIES <br />(If Remodeling) <br />(IBC Section 508) <br />NA <br />NA <br />NA <br />NA <br />(heavy timber roof permitted per 601, footnote c) <br />NA <br />NA <br />NA <br />(heavy timber roof permitted per 601, footnote c) <br />NA <br />NA <br />NA <br />NA <br />NA <br />See Code Plans <br />NA <br />See Code Plans <br />OTHER <br />INTERIOR REMODELING IMPACTS NEITHER BUILDING HEIGHT <br />NOR AREA. INFILL OF SECOND FLOOR AT THEATER DOES NOT <br />ALTER BUILDING AREA BASED UPON MBC BUILDING AREA <br />DEFINITION <br />PER DOCUMENTS FOR THE AC/BC EXPANSION, THE ORIGINAL <br />AC AND CC BUILDINGS WERE CLASSIFIED AS EQUIVALENT TO I-B <br />CONSTRUCTION AND WERE CONSIDERED A SINGLE BUILDING <br />PERMITTED TO BE UNLIMITED IN AREA. THE BC BUILDING WAS <br />CONSTRUCTED AS AN EXPANSION TO THIS EXISTING BUILDING. <br />NO FIRE WALL EXISTS BETWEEN THE AC/BC/CC ''BUILDINGS'' <br />Toilet fixture quantity of the AC/BC and CLC combined satisfies quantitiy and <br />distribution required as documented in correspondence w/ City of Arden Hills <br />PLUMBING FIXTURES <br />Toilet fixture quantity of the AC/BC and CLC combined satisfies quantitiy and <br />distribution required as documented in correspondence w/ City of Arden Hills <br />OCCUPANT LOAD OF ADDITION <br />TOTAL OCCUPANT LOAD SHOWN ON CODE ANALYSIS PLANS <br />UL P701 <br />UL P701 <br />UL N721 <br />UL N721 <br />X717 <br />DOC-FF-1 <br />DOC-FF-1 <br />DOC-FF-1 <br />DOC-FF-1 <br />B <br />B <br />OCCUPANT LOAD OF RENOVATION <br />RENOVATION ELIMINATES THEATHER - TOTAL BUILDING <br />OCCUPANT LOAD IS REDUCED BY RENOVATION <br />RESOLVE TOILET <br />COUNT ISSUE <br />FOURTH FLOOR UL <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING