My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-19-CRR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
05-22-19-CRR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:02:23 PM
Creation date
5/22/2019 2:25:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br />DATE: May 22, 2019 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />David Perrault, City Administrator <br /> <br />FROM: Sue Polka, Interim Public Works Director/City Engineer <br /> <br />SUBJECT: Geotechnical Evaluations – Professional Services Agreement with WSB for <br />Geotechnical Services <br /> <br />Budgeted Amount: Actual Amount: Funding Sources: <br /> N/A $13,497.00 General Fund <br /> Council Should Consider <br />Authorize a professional services agreement with WSB for geotechnical services for the 2020 <br />PMP area, Arden Oaks Drive, Arden Oaks Court and parking lots at City Hall, Hazelnut Park <br />and Perry Park in the amount of $13,497.00 (Attachment A). <br /> <br />Background/Discussion <br />The Capital Improvement Plan (CIP) identifies the 2020 PMP for reconstruction of streets in the <br />southwest corner of the City (Attachment B). To assist in preparation of the feasibility report, <br />staff is proposing to obtain soil borings and pavement recommendations in advance of the <br />design. In addition, pavements on Arden Oaks Drive and Arden Oaks Court have deteriorated <br />more rapidly than anticipated due to subsurface water issues evidenced by continual water <br />running in the gutterline and the lack of drain tile in the area. Geotechnical investigation will <br />assist staff in scheduling improvements and determining the extent of improvements for this <br />neighborhood. Lastly, staff is proposing 2 borings at each of the parking lots located at City <br />Hall, Hazelnut Park, and Perry Park to assist in designing current and future projects at those <br />locations. <br /> <br />WSB has provided scope and fees for geotechnical services in the amount of $13,497. Staff <br />recommends approval of a professional services agreement with WSB in the amount of <br />$13,497.00. <br /> <br />Attachments <br />Attachment A – WSB Proposal <br />Attachment B – Map 2020 PMP Area <br /> <br /> <br />CONSENT ITEM – 2C <br /> <br /> MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.