Laserfiche WebLink
<br />G:\Group Data\Materials\Darin\2019 Proposals\GEO\Arden Hills - 2020 PMP, Arden Oaks, Various Parking Lots\Arden Hills - 2020 PMP, Arden Oaks, Various <br />Parking Lots .docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM May 3, 2019 <br /> <br /> <br /> <br /> <br />Ms. Sue Polka, PE <br />Interim Public Works Director/City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br /> <br />Re: Proposal for: <br />Geotechnical Evaluations <br />2020 PMP Area and Arden Oaks Area Street and Utility Improvements, and 3 <br />Parking Lot Reconstructions <br />Arden Hills, Minnesota <br /> <br /> <br />Dear Ms. Polka: <br /> <br />Thank you for the opportunity to provide professional services for a geotechnical evaluation for <br />the above referenced project. In this proposal, we present a description of our understanding of <br />the project, an outline of the scope of work we are to provide, and a fee schedule and estimate of <br />charges for our services. <br /> <br />It is our understanding that this project consists of the reconstruction of: <br />2020 PMP Area; <br />• Glenpaul Avenue from Cleveland Avenue N. to New Brighton Road <br />• Edgewater Avenue from New Brighton Road west to its cul-de-sac <br />• Jerrold Avenue from New Brighton Road west to its cul -de-sac <br />• North Prior Avenue from Jerrold Avenue to West County Road D <br />Arden Oaks Area; <br />• Arden Oaks Drive from Snelling Avenue North to County Road E <br />• Arden Oaks Court from Arden Oaks Drive to its cul-de-sac <br />• City Hall Parking Lot <br />• Hazelnut Park Parking Lot <br />• Perry Park Parking Lot <br /> <br />The 2020 PMP and the Arden Oaks area contain city streets that are existing urban and rural <br />roadway alignments and are two lane bituminous roads. Typical reconstruction will generally <br />consist of creating a standard City street with curb and gutter and new watermains. <br /> <br />The three parking lots are bituminous paved and will be reconstructed. <br /> <br />In regard to all the projects existing horizontal and vertical alignment will remain the same. <br /> <br />A. Project Objectives <br /> <br />Based upon our experience with similar projects the objectives of our geotechnical services are to <br />perform subsurface borings, classify and analyze the soil samples, discuss groundwater issues, <br />and prepare recommendations for utility installation, subgrade preparation and pavement <br />sections.