My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-19 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2019
>
05-08-19 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 12:18:02 PM
Creation date
6/3/2019 12:03:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAIN ENTRANCEEXISTING BUILDINGMAIN GAME FIELD AND TRACKEXISTING TENNIS COURTSEXISTING BUILDING(STORAGE)PONDPONDSTORMWATER RETENTIONMARSHLAKE VALENTINE ROADPARENT LOOPJA N E T C O U R T <br />LOADING DOCKTICKETINGCONCESSIONSEDGE OF PROPERTYGYMNASIUMADDITIONNEW TURN LANECROSSWALK WITH BUMP-OUTLOT A(254)LOT B(224)LOT C(23)PARKING SETBACKWETLAND2650503117PROPOSED STORMWATER RETENTIONRELOCATED SOCCER FIELDRELOCATED LACROSSE FIELD / FOOTBALL FIELDEXISTING BASEBALL FIELDEASEMENTFAIRVIEW AVERELOCATED SOCCER FIELDNEW FIRE-LANECLASSROOM ADDITIONCLASSROOM ADDITIONPROPOSED NEW TREE LINEEXISTING TRACK EVENTSFIRE TRUCK TURN-AROUNDPARKING LOT (15)ACCESIBLEPARKING(13)ALTERNATE LOADING DOCKACCESSEXISTING SIDEWALKNEW SIDEWALKFLASHING PEDESTRIANLIGHTSPEDESTRIANMEDIANSEXISTINGSIDEWALKRAMPATHLETIC/STUDENT WALK-WAYSATHLETIC/STUDENTWALK-WAYSRE-ESTABLISH TURF-FALL 2020RELOCATE FIELD SUMMER 2019STUDENT PARKING DURING CONSTRUCTIONRECONFIGURE PARKING LOTS SUMMER 2019PRELIMINARY SUMMER 2020 CONSTRUCTIONCONTRACTOR / STAFF PARKING DURING CONSTRUCTIONCONSTRUCTION / DELIVERY ENTRANCESITE WORK TO COMMENCE APRIL 2019-S. LOT WILL BE CLOSED-HIGHLIGHTED ROADS WILL BE CLOSED TO PUBLIC / STUDENTS STARTING APRIL 2019STAFF PARKING DURING CONSTRUCTIONKA TRAILERSTAGINGATHLETIC WALKWAYSNEW FENCESOUTH ROAD / RETAINING WALL CONSTRUCTION: PHASE 3TEMP FIELDDURING CONSTRUCTIONWALK WAY BARRICADESACCESS RAMPSTO STAGINGTEMP HAUL ROADFOR FIELD RELOCATIONMAIN ROAD CONSRTUCTION:PHASE 2CHANGE DOORSWINGSECONDARY GYM EXITUPSTAIRS EXITCHANGE DOORSWINGBLOCK OFF STAGE ENTRANCE -NO ACCESS TO PUBLIC / STUDENTSENTRANCE AND BUS LOT:-FIRST LIFT SUMMER 2019- SECOND LIFT SUMMER 2020TEMP WALK WAY THROUGH CONSTRUCTION - BUILD AT END OF AUGUST FOR FALL STARTTECHNOLOGY WING EXITEXITS OFF LINEEXIT ROUTETEMP FENCEPARKING WALKWAYATHLETIC WALKWAYKEY:
The URL can be used to link to this page
Your browser does not support the video tag.