Laserfiche WebLink
RICE CREEK NORTH REGIONAL TRAIL MASTER PLAN | 29 <br />• Cross country ski repair stations <br />Multi-Season Trailhead Parking Lot <br />Additional parking will be required to service the multi-season trailhead and outdoor recreation area in the <br />central segment of the trail. It is anticipated that this parking lot will have capacity for 100-200 vehicles which will <br />be informed by the results of the building assessment. Storm water management best practices should also be <br />followed to meet or exceed any local ordinances. In addition multi-modal access should be considered which <br />may include: <br />• Traditional vehicle stalls <br />• Bicycle racks <br />• Electronic vehicle charging stations <br />• Public transportation stops at the trailhead <br />A shared trailhead entry drive is planned for construction in late 2019. This shared entry will serve the trailhead, <br />outdoor recreation area, parking lot, a future public development at the primer tracer site, the Army, and the <br />National Guard. <br />Outdoor Recreation Area <br />The area immediately surrounding the multi-seaon trailhead is a propsed outdoor recreation epicenter for the <br />Rice Creek North Regional Trail. This area would provide more of a traditional park setting to welcome everyone <br />and introduce them to the trail corridor. <br />In conjunction with the building development an outdoor recreation area is proposed to make the multi-season <br />trailhead a true year round destination that may include: <br />• Picnic tables <br />• Pavilions <br />• Fire Pit <br />• Public Art <br />• Creek Access <br />• Play Amenities <br />• Outdoor recreation programming area <br />• Interpretive and/or educational programming area <br />• Trail connections <br />• Drinking Fountains <br />• Cross country ski staging area <br />Carp Management & Research Barrier