My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
07-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 9:04:02 AM
Creation date
7/18/2019 4:55:04 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />City Council Meeting for July 22, 2019 <br />P:\Planning\Planning Cases\2019\19-002 – Summit Development <br />Page 3 of 8 <br /> <br />Plan Evaluation <br /> <br />A full evaluation of the proposal was presented to the Planning Commission on July 10, 2019. The <br />memo to the Planning Commission on this case is provided in Attachment H. Draft minutes from <br />the July 10, 2019 meeting are included in Attachment I. <br /> <br />Discussion: <br /> <br />A PUD proposal shall identify any requested modifications from the applicable zoning <br />requirements as well as the reasons why the modifications would be in the public interest and <br />would be consistent with the purpose of the R-4 District. Modifications to these requirements may <br />be granted by the City without a variance through the PUD process. <br /> <br />Lot Size, Building Coverage, and Landscaping – Flexibility Requested <br />The minimum lot size in the R-4 District is 3,630 square feet per unit, or 435,600 square feet (10 <br />acres). The total lot area of the subject property is 9.34 acres. The plat includes Outlot A, which is <br />the City park land, Lot 1, the site of the proposed building, and Outlot B, also owned by the <br />Applicant. The calculations in this section are based on the combined area of Lot 1 and Outlot B, <br />which is 240,015.6 square feet, or 5.51 acres. <br /> <br />The Zoning Code requirements for properties in the R-4 District allows a maximum building <br />footprint of 25% and requires a minimum landscaped lot area of 65 percent. Landscaping is defined <br />as all plantings, including trees, grass, and shrubs. The table below identifies the proposed <br />percentages. <br /> <br /> Proposed <br />Master PUD <br />(Sq. Ft.) <br />Proposed <br />Master PUD <br />(PCT) <br />Permitted <br />(R-4 District) <br />Structure Coverage 39,089 sq. ft. 16.3% Max. of 25% <br />Landscape Coverage 95,002 sq. ft. 39.6% Min. of 65% <br />Total area within Master PUD: 5.51 acres <br /> <br />Flexibility is requested for the minimum lot size and landscape coverage. <br /> <br />Height – Flexibility Requested <br />Section 1305.04 of the City Code defines building height as “the vertical distance from the average <br />elevation of the grade along a face of a building to the highest point of the roof surface of f lat <br />roofs, the deck line of mansard roofs, or the average height between the eaves and the highest <br />ridge of gable, hip, or gambrel roofs.” These measurements are illustrated in the drawing below.
The URL can be used to link to this page
Your browser does not support the video tag.