My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
08-12-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 4:19:49 PM
Creation date
8/8/2019 4:19:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Old Snelling Avenue improvements are anticipated to involve funding derived from special <br />assessments. The special assessment process must follow the City’s current special assessment <br />policy and maintain compliance with the requirements of Minnesota Statutes Chapter 429. The <br />initial step in the special assessment process is to complete a feasibility report. Due to project <br />specific challenges, including soil conditions, utility coordination and potential easement <br />acquisition, the feasibility report is recommended to include a site survey, geotechnical <br />investigation, and preliminary schematic layout . <br /> <br />Discussion <br /> <br />Over the past ten years, the City has undertaken multiple studies of the Old Snelling Avenue <br />corridor to identify potential infrastructure improvements. The four primary studies are listed <br />below. <br /> <br /> 2010 Geotechnical Exploration Report <br /> 2010 Preliminary Scoping Document <br /> 2012 Feasibility Report <br /> 2018 Intersection Control Evaluation <br /> <br />The Public Works Department is seeking an opportunity to briefly discuss the past studies and <br />review the preliminary project schedule as provided in Attachment A. A decision regarding the <br />schedule and project delivery process should be made in the near future to allow sufficient time <br />for project design and the anticipated special assessment process. <br /> <br />Attachments <br /> <br />Attachment A: Old Snelling Avenue and County Road E Improvements, Draft Project Delivery <br />Schedule
The URL can be used to link to this page
Your browser does not support the video tag.