My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
08-12-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 4:19:49 PM
Creation date
8/8/2019 4:19:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />31 <br />198575v4 <br /> <br /> Yard area, required rear. The minimum required rear yard depth multiplied by the <br />average width of the total rear yard. <br /> <br /> Zoning map. The map or maps incorporated into this Code as a part hereof, delineating <br />the zoning districts. <br /> <br /> <br /> SECTION 3. Chapter 13 – Zoning Code, Section 1325 – General Regulations, Subsection <br />1325.08 – Filling and Excavation, is hereby amended by deleting strikethrough language and <br />adding the underlined language as follows: <br /> <br />Chapter 13 – Zoning Code <br />Section 1325 – General Regulations <br /> <br />1325.08 Filling and Excavation. <br /> <br /> Subd. 1 Permit Required. An administrative permit shall be required for any filling or <br />excavation of up to four hundred (400) cubic yards per parcel, or four hundred (400) cubic yards <br />per acre, whichever is greater. Operations of over the above-described amounts shall be <br />considered land reclamation or mining, and shall require a conditional use permit in accordance <br />with Chapter 8 of the Arden Hills Code of Ordinances. <br /> <br /> Subd. 2 Exceptions. The following operations are excepted from the preceding permit <br />requirements: <br /> <br /> A. Excavation related to the construction of a building with a duly issued <br />building permit; <br /> <br /> B. Filling, excavation, and grading associated with site improvements and site <br />preparation for a duly approved subdivision or site plan; <br /> <br /> C. Excavation for construction of public streets and utilities; <br /> <br /> D. Filling, excavation, or movement of less than fifty (50) one hundred (100) <br />cubic yards of earth for landscaping purposes on a lot already occupied by a residential structure; <br /> <br /> E. Minor agricultural or conversation conservation operations. <br /> <br /> Subd. 3 Type of Fill. Fill to be placed on sites must be gravel, sand, dirt, clay or other <br />non-decomposable material similar to natural soils found in the upland area of Arden <br />Hills. Building construction materials, concrete, bituminous, and soils containing hazardous or <br />toxic waste, predominately organic materials, household wastes, mechanical debris, etc., shall <br />not be permitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.