My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
08-12-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 4:19:49 PM
Creation date
8/8/2019 4:19:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />32 <br />198575v4 <br /> Subd. 4 Performance Time. Filling and excavation operations for which a permit has <br />been issued shall be completed within a period as specified in the permit, but in no event <br />beyondof one hundred and twenty (120) days from the commencement of the operation, and <br />within one year of the issuance of the permit, unless an extension is requested of and granted by <br />the City Council. <br /> <br /> Subd. 5 Periodic Operations. Periodic filling or excavation of amounts less than four <br />hundred (400) cubic yards per parcel or per acre shall be allowed under separate administrative <br />permits until the composite total of such periodic operations exceeds four hundred (400) cubic <br />yards. Further operations will then be subject to the requirements of Chapter 8 of the Arden <br />Hills Code of Ordinances. <br /> <br /> Subd. 6 Submissions. The applicant for permit shall submit the following <br />information: <br /> <br /> A. A legal description, plat, or survey of property to be altered. <br /> <br /> B. A statement of purpose for the filling or excavation. <br /> <br /> C. A plan identifying the areas of the site to be altered, the estimated quantity of <br />material to be moved, the degree of grade adjustment, the proposed finished grade, the existing <br />and proposed drainage pattern, and proposed erosion control measures. A complete grading plan <br />may be required if considered necessary to the evaluation of the request. <br /> <br /> Subd. 7 Review Procedure. The permit application shall be reviewed by the City <br />Engineer and other members of the administrative staff to determine the impact of the proposed <br />operations upon drainage patterns, adjacent properties, wetlands, and bodies of water. The <br />permit may be approved as submitted, approved with modifications, or rejected because of <br />specifically stated adverse impacts. If denied, the applicant may appeal the administrative <br />decision to the City Council within ten (10) days. <br /> <br /> <br /> SECTION 4. Chapter 15 – Erosion and Sediment Control is hereby amended by deleting <br />strikethrough language and adding the underlined language as follows: <br /> <br />Chapter 15 - Erosion and Sediment Control <br /> <br />1500.00 Purpose and Scope <br /> <br />1500.04 Purpose. <br /> <br /> The purpose of this regulation is to control or eliminate soil erosion and sedimentation <br />within the City of Arden Hills. The regulation establishes standards and specifications for <br />conservation practices and planning activities which minimize soil erosion and sedimentation <br />and work to protect the City's natural resources for the health, safety, and welfare of the public.
The URL can be used to link to this page
Your browser does not support the video tag.