My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
08-19-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 10:26:55 AM
Creation date
8/15/2019 2:36:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br /> <br /> <br />Budget Impact <br /> <br />The project is proposed to include cost participation from the City of Arden Hills and the City of <br />Shoreview. The total project construction cost is estimated to be $9.4 million. The cost <br />allocated to the City of Arden Hills is estimated to be $710,701. The cost allocated to the City of <br />Shoreview is estimated to be $1,032,356. This information is subject to change as the design <br />process proceeds towards completion. <br /> <br />Below is a summary of the estimated construction cost and the associated funding. <br /> <br />Estimated Construction Costs <br />Items Estimated Cost <br />Traffic Signals, Sidewalk, Traffic Control $333,190 <br />Water Main $377,511 <br />Total $710,701 <br /> <br /> <br />Estimated Funding <br /> <br /> <br /> <br />Attachment <br /> <br />Attachment A: Draft Concept Layout <br />Item Current Est. Funding Anticipated Funding <br />PIR Fund $300,000 $333,190 <br />Water Utility $250,000 $377,511 <br />Total Cost $550,000 $710,701 <br />Special Assessments $0 ($166,595) <br />Total Net Cost to City $550,000 $544,106
The URL can be used to link to this page
Your browser does not support the video tag.