Laserfiche WebLink
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />The following table summarizes the estimated expenditures for the project. Funding for this <br />work is included in the 2019 Operating Budget under Street Maintenance, Sealcoating and <br />Resurfacing, 101-43100-44033. <br /> <br /> <br />Item Est. Cost <br />Paving Machine Rental $3,600 <br />Bituminous Material 500 Tons $30,900 <br />Tack Coat Application $3,765 <br />One (1) Tandem Truck and Operator $2,865 <br />Catch Basin and Manhole Materials $5,000 <br />Adjusting Rings $700 <br />Curb Replacement for Catch Basins $5,000 <br />Pavement Milling Contract $3,900 <br />Misc. Materials and Supplies $2,800 <br />TOTAL ESTIMATE $58,530 <br /> <br /> <br />Attachment <br /> <br />None