MUNICIPAL STATE AID
<br />CONSTRUCTION FUND (75% of allocation)
<br />25% of allocation goes to the General Fund for Maintenance.
<br />Construction Balance
<br />2001 Ending Balance 603,046.46
<br />2002 Allocation 204,447.00 807,493.46
<br />2003 Allocation 189,863.00 997,356.46
<br />187‐109‐001 Hamline to Lexington (709,805.80) 287,550.66
<br />2004 Allocation 198,655.00 486,205.66
<br />187‐020‐008 S Arden Hills to Thom Drive (return) 6,661.80 492,867.46
<br />2005 Allocation 209,004.00 701,871.46
<br />2006 Allocation 200,080.00 901,951.46
<br />187‐020‐010 Victoria/CSAH 96 (327,588.81) 574,362.65
<br />187‐105‐005 Lexington‐Grey Fox/Red Fox (225,000.00) 349,362.65
<br />2007 Allocation 192,496.00 541,858.65
<br />187‐020‐010 Victoria/CSAH 96 (6,770.71) 535,087.94
<br />2008 Allocation 193,743.00 728,830.94
<br />2009 Allocation 202,947.00 931,777.94
<br />2010 Allocation 205,678.00 1,137,455.94
<br />187‐020‐013 CP Rail System (296,957.91) 840,498.03
<br />2011 Allocation 228,050.00 1,068,548.03
<br />187‐020‐013 CP Rail System (119,547.45) 949,000.58
<br />2012 Allocation 225,083.00 1,174,083.58
<br />187‐109‐001 Hamline to Lexington (30,587.49) 1,143,496.09
<br />2013 Allocation 229,124.00 1,372,620.09
<br />187‐106‐002 Briar Knoll to CSAH 96 (105,166.90) 1,267,453.19
<br />2014 Allocation 237,859.00 1,505,312.19
<br />187‐106‐002 Briar Knoll to CSAH 96 (11,624.02) 1,493,688.17
<br />187‐106‐003 CSAH 96 to Gateway Blvd (1,260,367.20) 233,320.97
<br />2015 Allocation 258,675.00 491,995.97
<br />187‐108‐001 35W Bridge (69,000.00) 422,995.97
<br />187‐104‐003 CR E (CSAH 51) (37,714.07) 385,281.90
<br />187‐020‐017 CR E to CSAH 51 (455,342.80) (70,060.90) Advance
<br />187‐020‐016 Round Lake to CSAH 77 (CSAH 96) (79,537.14) (149,598.04) Advance
<br />187‐108‐002 35W Bridge, Lake Valentine Rd (624,651.97) (774,250.01) Advance
<br />2016 Allocation 264,361.00 (509,889.01) Pay down advance
|