Laserfiche WebLink
2017 Allocation 264,124.00        (245,765.01)     <br />187‐106‐003 CSAH 96 to Gateway Blvd (66,335.11)        (312,100.12)     <br />2018 Allocation 295,069.00        (17,031.12)        <br />187‐104‐003 CR E (CSAH 51) (6,139.49)           (23,170.61)        <br />2019 Allocation 293,894.00        270,723.39       <br />187‐020‐017 CR E to CSAH 51 (62,739.82)        207,983.57       <br />187‐104‐003 CR E (CSAH 51) (13,998.57)        193,985.00       <br />187‐106‐003 CSAH 96 to Gateway Blvd (193,985.00)      0.00                   <br />City is paid short on 187‐106‐003 CSAH 96 to Gateway Blvd 138,054.32         <br />This will be received with 2020 allocation. <br />City is in process of closing out two projects.  Unsure if we are due funds or not. <br />Based on original budget, City is due the following: <br />187‐020‐016 Round Lake to CSAH 77 (CSAH 96) 14,309.16           <br />187‐108‐002 35W Bridge, Lake Valentine Rd 27,907.16           <br />Paperwork is in the works for Old Snelling/Trail project.  Budget shows MSA funds as follows: <br />187‐020‐021 CR E & Hwy 51 ramp to intersection <br />187‐020‐022 County Road E2 1,465,065.53     <br />187‐020‐023 Old Highway 10