Laserfiche WebLink
EXHIBIT "B" <br />TO <br />DEVELOPMENT CONTRACT <br />Conditions of Approval <br />1. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to the plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City <br />Council. <br />2. Prior to the issuance of a Grading and Erosion Control permit, the Applicant shall enter <br />into a PUD Development Agreement with the City. The Development Agreement shall <br />outline conditions of approval, required securities and fees, and sequence of events. <br />3. A letter of credit equal to or 125% of the cost of the required landscaping must be <br />submitted to the City prior to issuance of a Grading and Erosion Control permit. <br />4. A Site Plan Review application shall be required for the reconstruction of the parking lot <br />on PID 21302334005. <br />5. Any use of the existing building on the on PID 21302334005 other than cold storage will <br />require an amendment to the approved PUD. The existing structure shall comply with <br />City Codes and any other use of the building shall meet all applicable codes. <br />6. Overnight vehicle storage is prohibited. All overnight vehicle storage shall be stored in <br />indoors. <br />7. No exterior storage shall be permitted onsite. <br />8. All light poles shall be a maximum of 25 feet in height, including base, and shall be <br />shoebox style, downward directed, with high-pressure sodium or LED lamps and flush <br />lens. Other than wash or architectural lighting, attached security lighting shall be shoebox <br />style, downward directed with flush lens. In addition, any entry lighting under canopies <br />shall be recessed and use a flush lens. Shields shall also be added as directed by the City. <br />9. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />10. Prior to the issuance of a Grading and Erosion Control permit, trees or tree areas that are <br />to be preserved shall be visibly marked and City -approved tree protection fencing or <br />other methods shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />11. The Applicant shall be responsible for obtaining any other permits necessary from other <br />agencies, MPCA, Rice Creek Watershed District, etc. prior to the start of any site <br />activities. <br />12. All disturbed boulevards shall be restored with sod. <br />13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />187184v1 20 <br />