Financial Impact <br />During construction, the following Change Orders occurred on the project related to the City's <br />portion of the project expenses. MnDOT administers the construction contract. City staff is <br />seeking formal consent for the change order items from the City Council at this time. <br />■ Change Order No. 1 - ($836.03) — Resetting trench box due to inaccuracies in as -built plans <br />for the City water main. The water main gate valve was located on an adjacent water main <br />segment. <br />■ Change Order No. 2 - ($797.50) — Sand filling abandoned watermain which as located under <br />the curb line for the southbound TH 10 off ramp. <br />■ Change Order No. 3 - ($774.62) — Portable toilets and drinking water for Scherer Bros due to <br />disruption of temporary water supply from Arden Manor. <br />■ Change Order No. 4 - ($460.00) — Addition of two (2) 30 MPH speed limit signs along the <br />Frontage Rd due to resident concerns with speeding traffic along the roadway. <br />The project is substantially complete, with all change orders involving City participation totaling <br />$2,868.15. This change order amount represents approximately one-half of one percent (0.5%) <br />of the City's cost share for the project. <br />Attachments <br />Attachment A: Change Order No. 1 & 2 <br />Attachment B: Change Order No. 3 <br />Attachment C: Change Order No. 4 <br />Page 2 of 2 <br />