Laserfiche WebLink
<br />City of Arden Hills <br />City Council Meeting for June 24, 2019 <br />P:\Planning\Planning Cases\2019\19-001 - Brausen - PUD, SP <br />Page 5 of 6 <br /> <br />Section 1325.05, Subd. 8 - Building Materials –Flexibility Requested <br />For new development, redevelopment, or modifications in the B-2 District, at least 75 percent of <br />the exterior building materials shall be of brick masonry, tile masonry, natural stone (or synthetic <br />equivalent), decorative concrete plank, transparent glass or any combination thereof. The <br />Applicant is requesting flexibility in exterior building materials to better incorporate the addition <br />into the existing garage structure. Based on the submitted site plan, 59 percent of the building <br />exterior will be comprised of materials required by the Zoning Code. <br /> <br />The east and south sides of the building are proposed to include concrete block in various <br />patterns and colors to match the existing repair garage. The east and south sides of the building <br />are the least visible to the public. The south side of the building faces a wooded landscaped area <br />belonging to Bethel University. The east side of the building faces neighboring businesses. <br />However, the majority of the existing tree screening/buffer between the site and the eastern <br />neighbor will be maintained, minimizing the appearance of the building. <br /> <br />The two most visible sides of the building, the north and west, have proposed exterior materials <br />that to comply with the 75 percent exterior building materials requirement. Building elevations <br />are shown below. <br /> <br /> <br />Public Notice and Comments <br /> <br />Notice of the public hearing for the Site Plan Review and Final PUD was published in the <br />Shoreview-Arden Hills Bulletin on June 12. 2019, and mailed to all properties within 500 feet of