My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
11-18-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 6:34:43 PM
Creation date
11/14/2019 6:33:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />City Council Meeting for June 24, 2019 <br />P:\Planning\Planning Cases\2019\19-001 - Brausen - PUD, SP <br />Page 5 of 6 <br /> <br />Section 1325.05, Subd. 8 - Building Materials –Flexibility Requested <br />For new development, redevelopment, or modifications in the B-2 District, at least 75 percent of <br />the exterior building materials shall be of brick masonry, tile masonry, natural stone (or synthetic <br />equivalent), decorative concrete plank, transparent glass or any combination thereof. The <br />Applicant is requesting flexibility in exterior building materials to better incorporate the addition <br />into the existing garage structure. Based on the submitted site plan, 59 percent of the building <br />exterior will be comprised of materials required by the Zoning Code. <br /> <br />The east and south sides of the building are proposed to include concrete block in various <br />patterns and colors to match the existing repair garage. The east and south sides of the building <br />are the least visible to the public. The south side of the building faces a wooded landscaped area <br />belonging to Bethel University. The east side of the building faces neighboring businesses. <br />However, the majority of the existing tree screening/buffer between the site and the eastern <br />neighbor will be maintained, minimizing the appearance of the building. <br /> <br />The two most visible sides of the building, the north and west, have proposed exterior materials <br />that to comply with the 75 percent exterior building materials requirement. Building elevations <br />are shown below. <br /> <br /> <br />Public Notice and Comments <br /> <br />Notice of the public hearing for the Site Plan Review and Final PUD was published in the <br />Shoreview-Arden Hills Bulletin on June 12. 2019, and mailed to all properties within 500 feet of
The URL can be used to link to this page
Your browser does not support the video tag.