My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
12-09-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:18:56 PM
Creation date
12/5/2019 2:13:57 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget Impact <br />The revised construction contract amount and overall budget for the Colleen Avenue Drainage <br />Improvements project is summarized below. <br />Original Contract Amount: <br />Change Order No. 1 <br />Change Order No. 2 <br />Change Order No. 3 <br />Change Order No. 4 <br />Amended Contract Amount: <br />Engineering Design <br />Construction Administration <br />Other costs <br />$ 250,247.00 <br />2,800.00 <br />2,456.00 <br />2,897.10 <br />Total Project Cost: $ <br />(3.5% Over Budgeted Amount) <br />1,100.00 <br />259,500.10 <br />42,142.00 <br />33,000.00 <br />2,305.63 <br />336,947.73 <br />The entire cost of this project is funded by the Surface Water Management Fund. <br />AttnehmPntc <br />Attachment A: Bolton & Menk Letter with Pay Request No. 3 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.