My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2019
>
11-18-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 12:34:01 PM
Creation date
12/10/2019 12:33:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION—NOVEMBER 18, 2019 4 <br /> Bob Bierwerth, Johnson Controls, introduced himself to the Council. He reported he has been <br /> with Johnson Controls for the past 17 years. He described the types of building solutions Johnson <br /> Controls completes within the HVAC industry. He explained Johnson Controls prided itself in <br /> providing services that were in place long-term. He noted the City's existing air conditioner was <br /> reaching its end of life. He indicated this system was too far away from the mechanical room. He <br /> then commented on the City's boiler system pointing out the deficiencies. <br /> Zac Haeg, Johnson Controls, introduced himself to the Council. He discussed a turn-key chilled <br /> water cooling solution that was being recommended for City Hall. He commented on the rebates <br /> that would be available for this type of system. He estimated the City would save 5%by replacing <br /> the heating and cooling units at the same time. He explained the new units would come with a <br /> five-year warranty. <br /> Councilmember Holden requested further information regarding the rebates that would be <br /> available to the City. <br /> Mr. Haeg discussed the standard and custom rebates that would be available to the City in further <br /> detail. <br /> Mr. Bierwerth commented on the proposed solar solution and noted the rebate would be paid <br /> back over 10 years. He recommended the Council not install solar panels until the roof on City <br /> Hall was replaced. He reported this project would be bid out through Source Well. <br /> Councilmember Scott questioned if geothermal options had been considered. <br /> Mr. Bierwerth stated this could be considered but explained the cost would be considerably <br /> higher for this type of energy use and noted the payback was roughly 40 years. <br /> Councilmember Holden commented she had a problem moving forward with this project <br /> without seeking additional bids from other qualified vendors, especially given the fact these units <br /> would cost more than $500,000. <br /> City Administrator Perrault explained the City of Grand Forks completed an HVAC <br /> improvement project through Source Well and all of the prices had been vetted. He stated if the <br /> Council would like to send this project out for bid a mechanical engineer would have to be hired <br /> to assist the City with this process. <br /> Mayor Grant agreed the proposal needed to be vetted and further bids should be requested. <br /> Councilmember Holmes asked if both the heating and cooling systems were in need of <br /> replacement. <br /> City Administrator Perrault reported both units were reaching their end of life. <br /> Council consensus was to direct staff to receive bids for the replacement of the City Hall HVAC <br /> units. <br />
The URL can be used to link to this page
Your browser does not support the video tag.