My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-05-2020 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2020
>
02-05-2020 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:29:26 AM
Creation date
2/3/2020 9:28:04 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GRADING AND EROSION CONTROL <br />1. Provide method of final soil stabilization and turf establishment. <br />2. City inspector may request additional or modifications to BMPs as needed. <br />UTILITIES <br />1. Verify minimum cover of 7.5-feet over the existing 16–inch diameter watermain along <br />Innovation Way within the proposed project area. <br />a. There shall be no excessive loading or excavation greater than 12-inches over the 16-inch <br />watermain without prior written consent from the City Engineer. <br />2. Verify location of gate valve for the 8-inch diameter water service crossing the proposed project <br />area. Due to the critical importance of the existing 16-inch diameter water main, a fully <br />functioning isolation valve is required on the existing 8-inch diameter water service east of the <br />proposed project area prior to the start of construction. <br />3. A riser section must be installed if adjustment rings exceed 12-inches on sewer structures. Verify <br />number of existing adjustment rings on manholes within project area. <br />4. Existing 6–inch diameter sanitary service must be temporarily plugged with bypass pumping during <br />sanitary sewer construction. <br />5. Verify sufficient grade for new sanitary sewer alignment during construction. <br />Provide invert elevations on as-built drawings submitted to the City. <br />6. Existing catch basin located in the south boundary of the proposed street connection is not located in <br />proposed curb line. Narrow driveway opening to match existing curb line in Innovation Way to the <br />north of this catch basin or provide detail for reconstruction of catch basin. <br />7. Show new location of light pole denoted as “relocate light pole”. <br />8. Add Insulation detail provided by the City of Arden Hills. <br />9. Add Sanitary structure detail provided by the City of Arden Hills. <br />HARD SURFACE <br />1. Label type of curb, proposed and existing. <br />2. Driveway apron and depressed curb to be constructed of concrete. <br />a. Provide detail plate. <br />b. Draw on Sheet C1. <br />The applicant should respond in writing as to how the above comments will be addressed.
The URL can be used to link to this page
Your browser does not support the video tag.