Laserfiche WebLink
<br />5 | P a g e <br /> <br />3. Figure for median change (up to two alternatives) <br />a. Change in curb and gutter and medians to accommodate more efficient garbage <br />truck movements – turning movement diagrams will be included on figures <br /> <br />4. Pavement design – based off of Geotechnical Report provided by WSB to be included in <br />the typical sections in the plans <br /> <br />5. Special provisions* - MnDOT 2018 boiler plate. Prepare Bid/Proposal form and merge <br />special provisions into City supplied front end documents to produce a Project Manual. <br /> <br />6. Engineer’s Opinion of Probable Construction Cost <br /> <br />7. Final CAD files in AutoCAD 2019 (unless a different version is requested by the City) <br /> <br />8. Review of shop drawing submittals limited to: storm structures and piping and <br />bituminous or concrete mix. <br /> <br />9. Attendance to one City Council work session to discuss the parking lot construction cost <br />– one HR Green representative <br /> <br />10. Bid opening and preconstruction meeting attendance <br /> <br />11. Review of shop drawing submittals limited to: <br />a. bituminous mix design <br />b. concrete mix design <br />c. truncated domes <br />d. lighting poles and luminaires. <br /> <br />12. Construction administration includes the following items: <br />a. response to contractor questions during advertisement and issue addenda <br />b. bid opening meeting <br />c. preconstruction meeting with awarded contractor <br />d. construction staking <br />e. Ten hours for material testing coordination for aggregate, bituminous, and <br />concrete <br /> <br />* Includes combined information for the Shorewood Drive Final Design and <br />Hamline Ave Crosswalks Final Design projects <br /> <br />ASSUMPTIONS <br />· City will upload construction documents to Quest CDN for construction advertisement <br />and will be responsible for posting any question responses and maintaining the webpage <br />throughout the advertisement length <br />· Pavement design will be based off of Geotechnical Report provided by WSB dated <br />September 19, 2019 <br />· No traffic control sheets needed – City staff will coordinate with nearby business <br />· No permit with Rice Creek Watershed District (RCWD) will be required because <br />reconstructed surface will be under 10,000 sq. ft. A desktop review shows that the