Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />Page 10 <br />4. A template for front-end specifications <br />5. Bid tab, advertisement, and contractor selection and contracting <br />6. Onsite construction observation <br /> <br />LEVEL OF EFFORT <br />The total fee for this work will be billed in accordance with the terms of the contract as indicated on the <br />Professional Services Agreement to which this scope and schedule of services is attached. The <br />following table demonstrates the estimated fee for the Shorewood Drive portion of the project. <br /> <br />ADDED VALUE SERVICES – NOT INCLUDED IN THE SCOPE <br />Although, it would not be required by a RCWD permit, HR Green recommends looking at options to <br />install a water quality BMP in the project. These options would likely be small and potentially include a <br />sumped manhole, a SAFL baffle (or other in-structure treatment) or a Rain Guardian or pretreatment <br />measure on the overflow. If the City chooses to implement one of the options, RCWD cost share <br />funding could be requested. Design and coordination efforts would be under an amendment to this <br />contract. <br />Task <br />Project <br />Engineer <br />Project <br />Manager/ Sr. <br />Engineer <br />Sr. <br />Technician <br />Staff <br />Engineer/ <br />Survey Admin. <br />TOTAL <br />Project Management 8 6 14 <br />Topographic Survey 0 <br />Construction Documents 12 16 96 36 160 <br />Construction Administration 4 16 20 <br />Total Hours 12 28 96 52 6 194 <br />Hourly Rate $145.00 $185.00 $130.00 $115.00 $91.00 <br />Total Labor by Role $1,740.00 $5,180.00 $12,480.00 $5,980.00 $546.00 <br />Total Labor - Project $25,926.00 <br />Direct Expenses (Mileage, Equipment $332.00 <br />Project Total Cost $26,258.00 <br />Hours by HR Green Team Role