My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
03-23-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 10:46:54 AM
Creation date
3/23/2020 4:35:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The existing picnic shelter would be replaced based on modern design specifications and <br />ADA access standards. <br />5. Playground areas would be completed with wood fiber mulch to meet safety standards. <br />6. Drainage improvements would be installed within the open field area to minimize <br />standing water. <br />Staff will not know until May if the City is awarded the funds. <br /> <br />Budget Impact <br />The estimated costs and funding is provided below. <br /> <br />COSTS <br /> Playground equipment 52,000 <br /> Site improvements 140,000 <br /> Engineering 35,000 <br /> Contingency (10%) 22,700 <br /> 249,700 <br /> <br />FUNDING <br /> City PIR Fund 60,000 <br /> CDBG Grant 189,700 <br /> 249,700 <br /> <br />The 2020 Capital Improvement Plan has $105,000 programed for the replacement of the existing <br />playground equipment at the park. <br /> <br />Attachments <br />A. Arden Hills Low-Moderate Income Block Groups Map <br />B. Water Ponding Exhibit <br />C. Resolution 2020-014 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.