Laserfiche WebLink
ITEM: COUNTY SHARE: NOTES: Trail/Sidewalk Grade Separation 0% to 50%, by negotiation Bridge or underpass construction. Street Lighting 0% Street Lighting as part of a traffic signal shall be paid 100% by County. Electrical power shall be paid by the municipality. Replacement Trees 100% 100%, if 1:1 replacement; 50%, if greater than 1:1 Fence 100% 100% if serviceable; 0% if in County R/W Turf Restoration 100% Amenities and Aesthetics 0% Special surface treatments, ground covers, or plantings, ornamental railings, etc. Driveway Replacement 100% Stormwater Treatment % eligible for State Aid Maintenance shall be based on contributing flows.