My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2020
>
03-16-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 9:12:21 AM
Creation date
3/25/2020 9:12:06 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION — JANUARY 21, 2020 2 <br />Mr. Salzer explained they would be requesting variances on building height, use restrictions, <br />design standards, surface parking setback and minimum lot size and went into further detail about <br />each topic. <br />Mayor Grant asked for thoughts on each of the proposed variance requests: <br />Maximum building height — Mayor Grant, Councilmembers Scott, Holden and Holmes <br />had no issues with a 40-foot building with 32 feet clear internal height. Councilmember <br />McClung wanted to stay with the current maximum height of 35 feet. <br />Use restrictions — Mayor Grant, Councilmembers Scott and Holmes agreed to 85% <br />warehouse, Councilmember Holden preferred 80% warehouse and Councilmember McClung <br />preferred 75% warehouse. <br />Design standards — no issues were indicated with the proposed materials. <br />Surface parking setbacks - Public Works Director/City Engineer Blomstrom expressed <br />the setback should be at least 30 feet on public roads for snow storage. <br />Minimum lot size — Councilmember Holden questioned if the remaining land would be <br />developable. Mr. Salzer explained the lot won't be any more developable with more than three <br />acres. <br />Councilmember Holden requested an easement be put on the property for a future City of Arden <br />Hills sign. She also asked if Round Lake Road could handle the traffic of the 32 proposed docks. <br />Public Works Director/City Engineer Blomstrom said staff had directed Scannell Properties to <br />conduct a traffic impact study. <br />C. MVHS Traffic Study Update <br />Public Works Director/City Engineer Blomstrom reported that a traffic and pedestrian study <br />was recently completed. The study was reviewed by City and School District staff for necessary <br />improvements along Lake Valentine Road. There is an estimated pedestrian count exceeding 250 <br />pedestrians per hour during arrival or dismissal time, and traffic operation concerns with traffic <br />flow formed the basis for the traffic study. There are twelve recommendations based on the report <br />that are summarized in the memo. <br />Public Works Director/City Engineer Blomstrom gave further explanation for each of the <br />recommendations. He asked if the Council concurred with the twelve recommendations and if so, <br />should staff prepare an amendment to the Planned Unit Development Agreement to memorialize <br />the requirements with the School District? <br />Mayor Grant asked if the School District was OK with the recommendations and what the cost <br />would be to the City. <br />Public Works Director/City Engineer Blomstrom said the School District had reviewed the <br />recommendations and were agreeable to them, and under the PUD the School District would be <br />responsible for all of the costs. <br />After discussion, Staff was directed to work with the School District to move forward with the <br />PUD Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.