Laserfiche WebLink
ATTACHMENT C <br />2021 PMP - Neighborhood Portion of Project Only <br />Arden HIlls, Minnesota <br />Project Number PW-21-0100 <br />Item No.Item Unit Unit Price Est. Quantity Total Price <br />2571.502 REPLACE TREE 2-INCH B AND B TREE 585.00 15.00 8,775.00 <br />2573.53 INLET PROTECTION - TYPE A EACH 128.00 30.00 3,840.00 <br />2123.604 TILL BOULEVARD SUBGRADE SQ YD 2.75 3,500.00 9,625.00 <br />2574.525 TOPSOIL BORROW (LV)CU YD 28.40 1,700.00 48,280.00 <br />2575.505 SODDING, TYPE LAWN SQ YD 3.90 3,500.00 13,650.00 <br />2575.525 EROSION CONTROL BLANKET, CATEGORY 3 SQ YD 4.50 500.00 2,250.00 <br />2575.535 POST WARRANTY SOD WATERING M GALS 15.25 30.00 457.50 <br />2575.601 EROSION CONTROL LS 1.00 5,000.00 5,000.00 <br />2575.605 HYDROSEEDING ACRE 6,180.00 1.00 6,180.00 <br />SUBTOTAL - RESTORATION 98,058$ <br />ENG. DESIGN, ADMIN, CONTINGENCY (20%)19,612$ <br />TOTAL - RESTORATION 117,669$ <br />1 Pavement Rehabilitation, Scope TBD LS 170,000.00 1.00 170,000.00 <br />2 Sanitary Sewer CIPP LS 87,000.00 1.00 87,000.00 <br />TOTAL - Lake Valentine Rd 257,000$ <br />Lake Valentine Road <br />RESTORATION <br />Page 3 of 3