Laserfiche WebLink
Professional Services Agreement <br /> City of Arden Hills—20.00419 <br /> EXHIBIT A <br /> STATEMENT OF WORK <br /> 1. SCOPE OF SERVICES <br /> TASK 1: Project Coordination: Consultant will review all available project related information,provide single point of contact <br /> for project management,guide the project through completion,and attend up to three(3)coordination meetings with City staff and <br /> one meeting with the Rice Creek Watershed District staff. <br /> TASK 2: Project Survey: Consultant will conduct a topographic survey of the project corridor to collect elevations and locations <br /> of surface features,including the following items. <br /> A. Survey the project area consisting of approximately 34,000 square feet,with recommended survey boundary approved <br /> by City Engineer prior to conducting field work. <br /> ■ Reference Ramsey County Coordinate System,NAD83(2011 adjustment). <br /> ■ Elevations based upon NAVD88. All units(horizontal and vertical)will be in US Survey Feet and given to the 0.01 <br /> foot. <br /> ■ Text(txt)file of all survey points,including project control,submitted to the City Engineer. <br /> B. Utility One-Call locating request to identify and survey the location of existing underground utilities. <br /> C. Base map of the project area depicting locations of existing surface features, contour lines,underground utilities and <br /> overhead utilities. <br /> TASK 3: Geotechnical Investigation: Consultant will coordinate geotechnical investigation for the site,including preparation <br /> of a geotechnical drilling and laboratory testing scope. The City will hire the geotechnical fnm directly to conduct soil borings. <br /> Consultant will recommend boring locations,assign soil tests,and review boring logs to support project design. <br /> TASK 4: Alternatives Review: Consultant will review and evaluate two or more alternatives for conveying stormwater runoff <br /> from the easterly terminus of pavement to the existing culvert passing under the downstream City trail system. The alternatives <br /> analysis will begin with the confirmation of the watershed area draining to the easterly terminus of pavement. <br /> A. Prepare sketch drawing of two or more alternatives. <br /> B. Prepare high level cost estimates for two or more alternatives. <br /> C. Identify advantages and disadvantages of two or more alternatives. <br /> D. Summarize results in a brief(short)technical memorandum. <br /> E. Review memorandum with City staff and assist in selecting a preferred alternative. <br /> TASK 5: Construction Plans and Project Manual: Consultant will prepare a set of construction plans and project manual for <br /> the selected alternative. <br /> A. Plan set shall include,but is not limited to,the following sheets: <br /> ■ Title Sheet <br /> ■ Statement of Estimated Quantities <br /> ■ Tabulation Sheet of Quantities <br /> ■ Construction Notes and Standard Plates <br /> ■ Removal Sheets <br /> ■ Plan and Profile Sheets <br /> ■ Pavement and Curb Restoration Sheets <br /> ■ Grading Plan <br /> ■ Erosion Control Sheets <br /> ■ SWPPP Sheets <br /> B. Plan Submittals Include: <br /> ■ 60%Plans and OPC for City Review <br /> ■ 90%Plans,OPC and specifications for City review <br /> ■ 100%plans,OPC and specifications forbidding <br /> C. Project Manual: Consultant will assemble specifications, special provisions and other documents to produce a project <br /> manual for bidding and construction contracting. City will provide Consultant with standard front end documents for the <br /> project manual,consisting of the following documents,for final editing by the Consultant. <br /> ■ Title Page <br /> ■ Certification <br /> ■ Advertisement for Bids <br /> Ulteig Professional Services Agreement Confidential <br /> Version: 12/15 Page 8 of 11 <br />