Page 2 of 2 <br /> <br />Firm Like Replacement Additional Cost for Alternative 2 Total Cost Range <br />Paulson and Clark $46,200 $13,160 $46,200 - $59,360 <br />BKV $83,520 $4,000 $83,520 - $87,520 <br />IMEG $49,500 No additional $49,500 <br />Nelson Rudie $65,570 No additional $65,570 <br />HGA $69,590 $30,190 $69,590 - $99,780 <br />Below is the average total score for each firm: <br /> <br />Firm Average Total Points <br />Paulson and Clark 82 <br />BKV 79 <br />IMEG 76 <br />Nelson-Rudie 74 <br />HGA 71 <br />Engineering staff and myself reviewed the proposals based on cost, experience, schedule, and <br />understanding of the project. Based on those criteria, Staff’s recommendation is to move <br />forward with Paulson and Clark for a cost of between $46,200 and $59,360. This firm was the <br />least expensive for replacing the equipment with similar equipment, but was not the cheapest <br />should another design be recommended; however, based on the proposals we thought they are <br />the best option for the City. Their proposal for the City is attached (see Attachment A). <br /> <br />Budget Impact <br /> <br />The City currently has $350,000 budgeted for this project in the Equipment, Building, <br />Replacement Fund. The total cost of the project is unclear, but if the design were to cost <br />$59,360, this would leave $290,640 for equipment and installation. The original estimate from <br />Johnson Controls for the project, depending on Council direction, ranged from $243,000 to <br />$470,109. The table below, which includes $350,000 budgeted for HVAC replacement in 2020 <br />and $299,000 for the parking lot project in 2021, shows the estimated balance of the Equipment <br />Building Replacement Fund at the end of 2020 as $61,445, and the projected ending balance of <br />the fund in 2025 as $600,445. The main source of funding for this fund is a $300,000 transfer <br />from the utility funds and a $50,000 property tax levy. These numbers may change as the CIP is <br />further developed throughout the budget process. <br /> <br />2020 2021 2022 2023 2024 2025 <br />Beginning Balance 294,445 61,445 (178,555)50,445 270,445 400,445 <br />Revenues 350,000 350,000 350,000 350,000 350,000 350,000 <br />Expenditures 583,000 590,000 121,000 130,000 220,000 150,000 <br />Ending Balance 61,445 (178,555)50,445 270,445 400,445 600,445 <br />Attachment <br /> Attachment A: Paulson and Clark Proposal for Engineering Services