My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report Page 1 <br />2021 PMP Street and Utility Improvements <br />City Project Number PW 21-0100 <br />1. INTRODUCTION <br /> <br />1.1 Authorization <br />On April 27, 2020, the Arden Hills City Council adopted Resolution 2020 -020 ordering the <br />preparation of an engineering feasibility report for the 2021 Pavement Management Program <br />(PMP). The resolution directs staff to study the need, cost-effectiveness and feasibility of <br />potential infrastructure improvements within the 2021 PMP project area. <br /> <br />1.2 Project Scope <br />This report investigates the feasibility of proposed street and utility improvements identified <br />within the City of Arden Hills Capital Improvement Program titled the 2021 Pavement <br />Management Program (2021 PMP). The proposed project was identified as a result of <br />deteriorating street pavement conditions and potential improvements to water main, sanitary <br />sewer and drainage infrastructure. Two areas are included within the scope of this study. <br /> <br />Area 1 – Hazelnut Park Residential Neighborhood <br /> Jerrold Avenue from New Brighton Road to approximately 825 feet west of Prior Avenue <br /> Edgewater Avenue from New Brighton Road to approximately 980 feet west of Prior Avenue <br /> Glenpaul Avenue from New Brighton Road to Cleveland Avenue <br /> Prior Avenue from County Road D to 150 feet north of Jerrold Avenue <br /> <br />Area 2 – Lake Valentine Road <br /> Lake Valentine Road from Snelling Avenue (CSAH 76) to Mounds View High School <br /> <br />A map depicting the location of potential street and utility improvements is provided in <br />Appendix A. <br /> <br />This report includes specific recommendations regarding the scope of improvements, <br />estimated project costs, funding sources, estimated assessments and a project delivery <br />schedule. Improvements within this report include street reconstruction, water main <br />replacement, sanitary sewer repairs and drainage improvements. <br /> <br />1.3 Available Data <br /> City of Arden Hills 2040 Comprehensive Plan <br /> City of Arden Hills Engineering Record Plans <br /> Geotechnical Report, dated September 19, 2019 <br /> Pavement Forensic Report dated May 6, 2020 <br /> Pavement Condition Ratings within the project area <br /> Sanitary Sewer CCTV Televising Inspections Data <br /> Water Main break and leak history <br /> GIS database for infrastructure conditions <br /> Field observations of project area <br /> City of Arden Hills Assessment Policy <br /> Arden Hills Engineering Design Standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.