My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report Page 3 <br />2021 PMP Street and Utility Improvements <br />City Project Number PW 21-0100 <br /> <br /> <br />2.3 Sanitary Sewer <br />The existing sanitary sewer within the study area consists of vitrified clay pipe (VCP), <br />polyvinyl chloride pipe (PVC) and reinforced concrete pipe (RCP) installed in the years <br />summarized on the following Table 2. Sanitary sewers were inspected by the City Public <br />Works Department using video televising equipment in the spring of 2020 and found to be <br />in good condition. Sanitary sewer service connection points were also evaluated as part of <br />the inspection process. Approximately 19 locations were identified as needing spot repairs <br />were sewer services connect to the sewer main, as described in Section 3 of this report. A 6- <br />inch diameter force main extends along Edgewater Avenue from Lift Station #1 to west limit <br />of gravity sewer 330 feet west of Prior Avenue. The condition of this force main will be <br />further evaluated during the design process. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />2.4 Water Main <br />The existing water distribution mains within the study area consists of cast iron pipe (CIP) <br />and ductile iron pipe (DIP) as summarized on the following Table 3. A review of the City’s <br />water main break historical records did not identify any water main pipe break or leak repairs, <br />other than isolated curb stop leaks located on the house side of the curb stops as noted below. <br /> <br /> <br /> <br />Table 2: Summary of Existing Sanitary Sewer Conditions <br />Street Name <br />Pipe <br />Material <br />Pipe <br />Diameter <br />Year <br />Installed <br />CIPP <br />Lining <br />Lining <br />Year <br />Overall <br />Condition of <br />Main Pipe <br />Jerrold Ave (east) VCP 8-inch 1961 Yes 2013 Good <br />Jerrold Ave (west) PVC 8-inch 1977 No Good <br />Edgewater Ave <br />(east) VCP 8-inch 1960 Yes 2013 Good <br />Edgewater Ave <br />(west) PVC 8-inch 1977 No Good <br />Edgewater Ave <br />(west) CIP 6-inch <br />Forcemain 1960 No TBD <br />Glenpaul Ave VCP 8-inch 1961 Yes 2013 Good <br />Prior Ave RCP 21-inch 1961 No Fair <br />Lake Valentine <br />Road VCP 8-inch 1960 No Fair (root <br />cutting)
The URL can be used to link to this page
Your browser does not support the video tag.