My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Geotechnical Report <br />2020 PMP Street Improvements <br />Arden Hills, Minnesota <br />WSB Project No. 014297-000 Page 6 <br />4.5 Pavement Areas <br />After removing the existing pavement sections and backfilling the utilities, the final subgrade should have <br />proper stability within three vertical feet of grading grade (grade which contacts the bottom of the <br />aggregate base). This will generally be achieved in fill areas with proper compaction of embankment <br />materials and in cut areas through proper subgrade preparation. The stability of the pavement subgrade <br />should be evaluated using the test roll procedure (MnDOT 2111), except a fully loaded tandem axle dump <br />truck or a full water truck should be utilized for the proof roll. If unstable soils are found under the test roll, <br />these soils should be improved by means of scarification, moisture conditioning, and re-compaction, or by <br />subcutting and replacement. If the on-site soils cannot be moisture conditioned and compacted as <br />recommended, we recommend removing these unsuitable materials and re placing them with Select <br />Grading Material (MnDOT 2105.1.A.6). We also recommend a proof-roll be performed again on the <br />aggregate base just prior to placement of the bituminous pavement. <br /> <br />Table 3 below presents the approximate pavement section thickness and subgrade soils that were <br />encountered within the borings. <br /> <br />Table 3: Existing Roadway Soil Boring Profiles <br />Boring No. <br />Bituminous <br />Thickness <br />(inches) <br />Aggregate <br />Base <br />Thickness <br />(inches) <br />Subgrade Soils <br />(Upper 4 feet) <br />PB-1 4 7 Fill: Sand with silt <br />PB-2 3 ½ 6 Fill: Silty sand and sand with silt <br />PB-3 4 ½ 5 Sand and Sand with silt <br />PB-4 4 ½ 7 Fill: Silty sand and sand with silt <br />PB-5 4 7 Fill: Silty sand <br />PB-6 4 3 Fill: Silty sand <br />PB-7 5 4 Fill: Sand with silt <br />PB-8 3 ½ 4 Fill: Lean clay <br />PB-9 4 9 Fill: Sand with silt <br />PB-10 3 7 Fill: Lean clay <br />PB-11 3 ½ 7 Fill: Sand with silt <br />PB-12 3 6 Fill: Sand with Silt <br />PB-13 3 ½ 5 Fill: Sand with silt and silty sand <br /> <br /> <br />Once the site has been prepared as recommended, we anticipate the subgrade will consist predominately <br />sand with silt, sand and silty sand. The MnDOT Flexible Pavement Design Guidance Memo from January <br />2017, indicates soils such as those anticipated have an estimated R-value ranging from 20 to 70. It has <br />been our experience that on projects with utility construction the final subgrades are generally a mix of <br />soils excavated from the trenches. Also, lean clay was present in the subgrade at some locations, as <br />such, we used an R-value of 20 for our design. <br /> <br />Being traffic counts were not provided to us, we have assumed that the volume and distribution of <br />vehicles using these roadways will have 20-year flexible Equivalent Single Axle Loads (ESAL’s) less than <br />75,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.