My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-23-2020-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-23-2020-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 3:48:16 PM
Creation date
7/24/2020 3:47:40 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills City Hall Mechanical Assessment 22020 <br /> <br />3 | Page <br /> <br />IIntroduction <br />The Arden Hills City Hall was built in 2000. The building is approximately 17,000 square feet with a <br />partial basement and partial second floor. The main floor houses city offices and the council chambers. <br />The upper floor has offices while the basement has a community room, storage and mechanical spaces. <br />The scope of the project includes the building HVAC systems and Domestic Hot Water Heater. The <br />following observations were made on June 12, 2020. <br />Domestic Water Heating Systems <br />The main building domestic hot water heater is a State model SBF75120NE gas-fired tank-type <br />commercial water heater located in the boiler room. The water heater appears to be original to the <br />building. The water heater appeared to be in fair condition with some small amounts of rust forming. <br />Based on the age, the water heater is near the end of its expected life and should be replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.