Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—JUNE 22, 2020 16 <br /> parcels that total approximately 43 acres. The northern parcel which is 21.52 acres in size contains <br /> the access road off of Pine Tree Drive and the majority of the surface parking. The center parcel <br /> which is 19.16 acres in size contains an existing 181,432 square foot office building and a small <br /> fraction of the surface parking. The remaining undeveloped parcel to the south is 2.43 acres in <br /> size and is made up of mainly woodlands and wetlands. The Applicant is proposing to subdivide <br /> the northern parcel into two (2) new lots and consolidate the center parcel and the remaining <br /> southern exception parcel into one lot of record. <br /> Community Development Manager/City Planner Mrosla commented it is important to note <br /> that the current platting process is not associated with any specific development on the site. <br /> However, the Lake Johanna Fire Department is in the due diligence process to acquire the lot <br /> adjacent to Pine Tree Drive for a future fire station. This application only pertains to Bethel's <br /> request to divide the land and not future development projects. It was noted the Planning <br /> Commission recommended approval of Planning Case 20-005 with 7-0 vote. A motion for <br /> approval of Planning Case 20-005 for a Master Planned Unit Development and Preliminary <br /> Plat/Final Plat at 2 Pine Tree Drive, based on the findings of fact and submitted plans, subject to <br /> the following (16) conditions: <br /> 1. The project shall be completed in accordance with the plans submitted and as amended by <br /> the conditions of approval. Any significant changes to the plans, as determined by the City <br /> Planner, shall require review and approval by the City Council. <br /> 2. All conditions of the Master PUD and Preliminary Plat approval shall remain in full force <br /> and effect. <br /> 3. The applicant shall record the Final Plat with Ramsey County and a copy shall be provided <br /> to the City within sixty (90) days of the City's approval. <br /> 4. A Development Agreement shall be prepared by the City Attorney and subject to City <br /> Council approval. The Development Agreement shall be fully executed prior to release of <br /> the Final Plat. <br /> 5. Survey monuments shall be placed and installed at all block corners, angle points, points <br /> of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or steel <br /> rods shall be placed at the corners of each lot. <br /> 6. The Developer Agreement shall identify maintenance responsibilities for Outlot A. Unless <br /> specifically modified within the Development Agreement, all maintenance responsibilities <br /> shall be completed by the property owner of Lot 3, Block 1. <br /> 7. All trails on Lot 3, Block 1 shall remain open to the public and terms of the agreement <br /> shall be memorialized in the Developers Agreement. <br /> 8. Prior to the release of the Final plat, the property owner of Lot 1, Block 1 shall submit a <br /> maintenance plan for the exiting trails on the subject parcel unless a written agreement <br /> between the City and owner establishes a different requirement. <br /> 9. A 6-ft wide sidewalk shall be constructed along the realigned section of the private <br /> driveway extending from Pine Tree Drive to Lot 3. <br /> 10. A 6-ft wide sidewalk shall be constructed along the west side of Pine Tree Drive from <br /> Outlot A to the north boundary of "Exception Parcel C" upon development of Lot 2 or <br /> relocation of the private driveway. <br /> 11. A traffic impact analysis shall be prepared in accordance with City standards and provided <br /> to City staff for review prior to development of Lot 1 and Lot 2. <br />