My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-21-20-PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2020
>
07-21-20-PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 9:04:33 AM
Creation date
8/17/2020 9:04:10 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Mounds View High School Trail Project <br />Application Category: Multiuse Trails and Bicycle Facilities <br />Applicant: City of Arden Hills <br />City: Arden Hills <br />County: Ramsey County <br />Route: Lake Valentine Road to Old Highway 10 to County Road E2 <br />Federal Award Requested: $974,936.00 <br />Total Project Cost: $1,218,670.00 <br />The Mounds View High School project offers a wide variety of benefits to the community. The proposed <br />trail project will fill gaps within the larger regional trail network, creating connections to new <br />communities. With the addition of these newfound connections, the community will therefore grow and <br />form new relationships. It is Arden Hills goal to increase the unity and cohesion within the community <br />and encourage residents to seek out those relationships. The Mounds View High School trail project will <br />provide an important connection to the Mounds View High School. The project would be used daily by <br />both students and teachers commuting to and from the high school either via walking or bicycle. As a <br />result of the connection to the high school, pedestrians and bicyclists will remain safe and have a much <br />quicker, direct route to their destination. Residents will also be connected to various destinations, such <br />as the newly redeveloped Valentine Park, Tony Schmidt Regional Park, jobs, and much more. Since <br />residents of low‐income populations are more likely to not own a vehicle, the proposed trail project will <br />allow them more access to a wide variety of jobs, schools, and more. The city of Arden Hills wants to <br />provide all residents the same opportunities regardless of their socio‐economic status. Among all these <br />goals and benefits is the underlying benefit of improving the overall health of the community. With the <br />connection to the regional trail network, residents will be encouraged to use the trails and pleased to <br />find the new connections. <br /> Trail going north at the <br />intersection of County Road E2 <br />and Old Highway 10 <br />Trail going west at intersection <br />of Lake Valentine Road and Old <br />Highway 10 towards Mounds <br />View High School <br />Trail end at east parking lot <br />at Mounds View High School <br />ATTACHMENT A
The URL can be used to link to this page
Your browser does not support the video tag.