My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-20-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 3:54:15 PM
Creation date
9/8/2020 3:50:35 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2021 2025 <br />thru Department Surface Water Management D <br /> Description <br />Replace failing retaining wall adjacent to the west bank of Karth Lake at the lake outlet pump. Staff will investigate alternatives, including <br />repair/replacement of wall and removal of wall with bank stabiliztion measures. Short term repairs will be made to redirect drainage from being <br />conveyed over the top of the wall. <br />Project #23-Storm-001 <br />Priority 2 Very Important <br /> Justification <br />Existing retaining wall is in need of repairs. <br /> Budget Impact/Other <br />Prevent erosion and address park safety issues. <br />Useful Life 20 <br />Project Name Karth Lake retaining wall Category Storm Water Maintenance <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$65,000 <br />Total2021 2022 2023 2024 2025Expenditures <br />65,00065,000Construction/Maintenance <br />65,000 65,000Total <br />Total2021 2022 2023 2024 2025Funding Sources <br />65,00065,000Surface Water Mgmt Utility <br />Funds <br />65,000 65,000Total <br />Produced Using the Plan-It Capital Planning Software <br />28
The URL can be used to link to this page
Your browser does not support the video tag.