Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2021 2025 <br />thru Department Surface Water Management D <br /> Description <br />This project is the first phase of a program to address accumulated sediment within stormwater ponds in the City's drainage system to maintain <br />system compliance with State MS4 requirements. Staff measured sediment accumulation in several ponds in 2019/2020 and identified the Benton <br />Way pond in 2023 ($225,000) and the Glen Arden pond in 2026 ($160,000) as the higher priority maintenance locations within the drainage <br />system. <br />Project #23-Storm-002 <br />Priority 2 Very Important <br /> Justification <br />Maintenance is required by the City's MS4 permit issued by the MPCA. <br /> Budget Impact/Other <br />Useful Life 20-25 <br />Project Name Storm Pond and Outfall Maintenance Category Storm Water Maintenance <br />Type Maintenance <br />TCAAP No <br />Total Project Cost:$495,000 <br />Total2021 2022 2023 2024 2025Expenditures <br />225,000225,000Construction/Maintenance <br />225,000 225,000Total <br />Total2021 2022 2023 2024 2025Funding Sources <br />225,000225,000Surface Water Mgmt Utility <br />Funds <br />225,000 225,000Total <br />Produced Using the Plan-It Capital Planning Software <br />29