My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-20-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 3:54:15 PM
Creation date
9/8/2020 3:50:35 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Phase I Environmental Site Assessment <br />Old Snelling Avenue & County Road E Improvements <br />WSB Project No. 015447-000 Page 13 <br />The Project Corridor was not yet developed on the 1902 map. The Project Corridor has <br />remained a north-south section of Old Snelling Avenue since at least 1952. <br /> <br />Adjacent Site Map Observations <br /> <br />The adjacent sites are depicted as undeveloped on the 1902 map. The adjacent <br />residential sites and cross streets along the northern half of the Project Corridor are <br />shown as developed on the 1952 and subsequent maps. Undeveloped wetlands are <br />located adjacent to the southern portion of the Project Corridor on the 1952 to 1980 <br />maps, until residential development is visible on the 1993 map. <br /> <br />· City Building and Inspection File Review: No information indicating the removal of <br />former buildings or structures at the Project Corridor was identified. Therefore, WSB did <br />not request City or County inspection records as part of this assessment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.