My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-20-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 3:54:15 PM
Creation date
9/8/2020 3:50:35 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
example, the 2020 rate increase for water and sewer was 3% even though the rate study <br />recommended 6.5%. <br />• Public Works staff continues to evaluate the condition of City utilities throughout the <br />community. The majority of street projects currently include a minimum amount for isolated <br />utility repairs. Staff will complete a comprehensive review of the utility systems to identify <br />locations where broader water, sanitary sewer and drainage replacement is needed. This will <br />increase the forecasted capital expenses for the utility funds. <br /> <br />Budget Impact <br />The Council should review the estimated fund balances and funding sources with special attention <br />given to the Permanent Improvement Revolving (PIR) Fund, Equipment Building Replacement <br />Fund, and the Public Safety Capital Fund. <br /> <br />Attachments <br />Attachment A: Overview of Capital Improvement Plan <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.