Laserfiche WebLink
ATTACHMENT A <br /> SCOPE OF SERVICES <br /> The selected consultant shall complete the following work items as part of the professional <br /> services agreement (Work). Respondents may provide recommended modifications to the <br /> scope as they deem appropriate. <br /> TASK 1: Project Coordination: Consultant will provide coordination services to guide the <br /> project through design, bidding and construction phases. This task shall include the following <br /> work items. <br /> A. Provide a designated Project Manager to serve as a single point of contact and guide <br /> the project through completion. <br /> B. Attendance at a project design kick-off meeting with City staff. <br /> C. Attendance at up to five (5) design coordination meetings with City staff. <br /> D. Attendance or conference calls (est. 2) with Rice Creek Watershed District staff. <br /> E. Attendance or on-line participation at up to three (3) City Council meetings to assist <br /> with presenting project information. <br /> TASK 2: Data Collection and Information Review: Consultant will collect and review <br /> project related information associated with the project, including but not limited to the following <br /> documents. <br /> A. City of Arden Hills Engineering Record Plans <br /> B. Geotechnical Report, dated September 19, 2019 <br /> C. Pavement Forensic Report dated May 6, 2020 <br /> D. Project Feasibility Report, available July 28, 2020 <br /> E. Pavement Condition Ratings within the project area <br /> F. Sanitary Sewer CCTV Televising Inspections Data <br /> G. Water Main break and leak history <br /> H. GIS database for infrastructure conditions <br /> I. Field Observations of Project Area <br /> J. City of Arden Hills Engineering Design Standards <br /> K. MnDOT State Aid Design Standards <br /> L. City's standard general and special provisions, front-end specifications <br /> TASK 3: Project Survey: Consultant will conduct a topographic survey of the project corridor <br /> to collect elevations and locations of surface features. This task shall include the following <br /> items. <br /> A. Conduct field survey of the project area, with recommended survey boundary <br /> approved by City Engineer prior to conducting field work. <br /> B. Locate and survey property corner monuments adjacent to the street right of way to <br /> the extent practical within the project area. <br /> C. Conform to the following survey standards unless otherwise approved by the City. <br /> ■ Reference Ramsey County Coordinate System, NAD83 (2011 adjustment). <br /> ■ Elevations based upon NAVD88. All units (horizontal and vertical) will be in US <br /> Survey Feet and given to the 0.01 foot. <br /> D. Conduct utility One-Call locating request to identify and survey the location of existing <br /> underground utilities. <br /> Page 1 of 3 <br />