Laserfiche WebLink
E. Produce base map of the project area depicting locations of existing surface features, <br /> contour lines, curb stop locations, underground utilities and overhead utilities. <br /> F. Submit base map to City for review prior to initiating design work. <br /> TASK 4: Design Analysis: Consultant will conduct the following analysis during the early <br /> stages of the project design process. <br /> A. Review all data and information as outlined in Task 2 along with field observations and <br /> field survey information. <br /> B. Review the recommended scope of improvements and cost estimates provided in the <br /> Feasibility Report. <br /> C. Prepare a brief technical memorandum summarizing the consultant's suggested <br /> changes in the project scope for street and utility improvements that may differ from <br /> the findings of the Feasibility Report. <br /> D. Review technical memorandum with City staff to establish the final scope of <br /> infrastructure improvements. <br /> TASK 5: Project Plans: Consultant will prepare construction plans and an opinion of <br /> probable cost (OPC) for City approval, procurement of bids and construction. This task shall <br /> include the following items. <br /> A. Prepare plan set including, but not limited to, the following sheets: <br /> ■ Title Sheet <br /> ■ Statement of Estimated Quantities <br /> ■ Tabulation of Utilities and Features <br /> ■ Construction Notes and Standard Plates <br /> ■ Removal Sheets <br /> ■ Construction Staging/Sequencing Sheets <br /> ■ Traffic Control Sheets <br /> ■ Street and Drainage Plan and Profile Sheets <br /> ■ Water and Sanitary Sewer Plan and Profile Sheets <br /> ■ Erosion Control and SWPPP Sheets <br /> ■ Cross Sections Sheets <br /> B. Provide plan submittals: <br /> ■ 60% Plans,OPC and specifications for City Review <br /> ■ 90% Plans, OPC and specifications for City review <br /> ■ 100% plans, OPC and specifications for bidding <br /> C. Coordination of submittals and approvals for the following anticipated permits <br /> ■ Minnesota Department of Health Water Main Permit <br /> ■ Rice Creek Watershed District <br /> ■ Ramsey County Right of Way Permit <br /> ■ MPCA Stormwater Permit <br /> TASK 6: Project Manual/Specifications: Consultant will assemble specifications and other <br /> documents to produce a project manual for bidding and construction contracting. <br /> A. City will provide Consultant with standard front end documents for the project manual, <br /> consisting of the following documents, for final editing by the Consultant. <br /> ■ Title Page <br /> ■ Certification <br /> ■ Advertisement for Bids <br /> Page 2 of 3 <br />