My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-10-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:20:15 AM
Creation date
9/8/2020 4:14:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding and Approach O <br /> Project Risks and Challenges <br /> We have created the following project risks matrix outlining the different challenges that may be involved with <br /> the project and the level of risk for each item. Some of these risks include a higher level of public outreach due to <br /> the addition of curb and gutter,higher costs due to requirements of the RCWD, and uncertain life expectancy of <br /> underground utilities with spot utility replacement. <br /> 2021 Hazelnut Park Risks Matrix <br /> What's at Risk? <br /> -AI�EN HILLS '• ' <br /> .........................................:..................................... <br /> ...........................................................................:......................................... <br /> iI <br /> ii <br /> .........................................:.....................................:.....................................:.....................................:......................................... <br /> ii i i is <br /> ......................................... <br /> ..................................... <br /> ..................................... <br /> ..................................... <br /> ......................................... <br /> Low Risk Medium Risk High Risk <br /> Task 1 : Project Coordination <br /> Bolton&Menk will designate a project manager as a Bolton&Menk will facilitate a meeting with RCWD <br /> single point of contact through the duration of the project. staff to coordinate project goals early in the design <br /> This project manager will be Sarah Lloyd,with the help process. Specifically, coordination will be required when <br /> of Nick Amatuccio as the lead project engineer and the project's potential added impervious area is known. <br /> construction manager. We anticipate one additional meeting(two total)prior <br /> to final permit submittal, as well as written and verbal <br /> Bolton&Menk will attend and coordinate the necessary communication throughout design,to ensure project <br /> meetings with city staff as laid out in the RFR We will also timelines are met. <br /> attend and participate in up to three city council meetings, <br /> in-person or virtually,as required for the project. Task 2: Data Collection a n d <br /> Early coordination with RCWD will allow the project Information Review <br /> team to be proactive,instead of reactive,in terms of final Bolton&Menk will collect and review all the information <br /> stormwater management requirements.Understanding all the as laid out in the RFP,including but not limited to city <br /> project's permitting challenges and opportunities early will record plans,geotechnical report,pavement forensic <br /> report,project feasibility report,pavement condition <br /> give the city peace of mind before bidding and construction. <br /> The project requires the addition of curb,gutter,and storm ratings, sanitary sewer televising,watermain break/leak <br /> sewer to effectively serve neighborhood areas that currently history, GIS database,field observations, city and MnDOT <br /> lack effective stormwater management. Constructing curb, design standards, and the city's standard general and <br /> gutter,and storm sewer changes the nature of drainage special provisions. <br /> by increasing the system's efficacy to move water from <br /> the surface and convey it much faster to the discharge Task 3: Project Survey <br /> point.Therefore,managing rates of stormwater runoff Bolton&Menk will conduct a field survey to create a base <br /> may be challenging during this rural to urban conversion. map identifying above and below ground existing features <br /> Fortunately,Bolton&Menk has a rich history in designing, in electronic format.This base map will be used as the basis <br /> permitting,and constructing these types of upgrades, and background for final design.We will recommend a <br /> specifically in communities throughout the RCWD. We know survey boundary and wait for approval by the city engineer <br /> what the RCWD will expect from us and they are familiar prior to field work. <br /> with our permitting submittal packages. This translates to <br /> effective communication, uninterrupted project schedules, <br /> and cost savings for the City of Arden Hills. <br /> 2021 Hazelnut Park/Gtenpaut Neighborhood Street and Utility Improvements I City of Arden Hills, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.