Laserfiche WebLink
Understanding and Approach <br /> �o�� <br /> The field survey will include the following efforts: Our team will review the project in the context of RCWD <br /> • Research of county information(section,maps,plats,etc.) permit requirements,including stormwater management <br /> • Research of MnDOT information(such as geodetic monuments) and erosion and sediment control.We will analyze the <br /> • Submit Gopher State One Call tickets for field markings and maps along all newly constructed impervious area footprint to determine <br /> streets,except for the reclaim portions locations and sizes for best management practices.We <br /> • Preparing/calculations for field staff(property corner search points,survey will assemble existing and proposed conditions hydraulic <br /> collector job file,etc.) models to size proposed storm sewer improvements, <br /> • Establishing project control based on Ramsey County coordinate system, determine the potential increase in stormwater discharge <br /> NAD 83(2011 Adj.)with elevations based on NAVD 88 rates at key receiving locations, and determine the resulting <br /> • Field locations of existing conditions,utilities,property corners,etc. size and efficacy of infiltration systems. <br /> • Topographic limits for reclaim areas will be curb line to curb line and <br /> location and rim elevation of utility structures only Soils in the area appear to be conducive to infiltration. <br /> • Topographic limits for full reconstruction areas will be right-of-way to Therefore,it will be necessary to review the geotechnical <br /> right-of-way; property corners will not be located within reclaim areas report provided by the city for any potential issues this <br /> and GIS lines will be used to show approximate right-of-way lines may cause. <br /> • Complete sanitary and storm structure inventories on existing structures <br /> within full reconstruction areas only Task 5: Project Plans <br /> • Complete right-of-way determination in full reconstruction areas only Final design and construction plans will be completed in <br /> • Complete a base map of the project area per RFP requirements AutoCAD Civil 3D and developed in coordination with city <br /> An electronic base map will be created and submitted to the staff.Major design components will include <br /> city for review prior to initiating design work. • Roadway alignment and width <br /> • Profiles and intersection layout with curb and gutter elevations in the <br /> Task 4: Design Analysis reconstruction areas <br /> Bolton&Menk will evaluate the geotechnical report • Cross sections at 50-foot intervals,driveways,and critical design locations <br /> provided by the city to deliver a project design consistent in the reconstruction areas <br /> with the report recommendations. • Existing location and elevations of all existing utilities identified in the field <br /> • Storm sewer sizing and design;this includes discussions with governing <br /> Bolton&Menk will review the proposed street agencies and city staff on the proper stormwater management plan for the <br /> improvements,watermain replacement, sanitary sewer developed area <br /> rehabilitation,and storm sewer extension laid out in the • Identification of necessary replacement and/or relocation of private utilities <br /> feasibility report provided by the city.We will review (including electric,gas,telephone,cable TV,etc.) <br /> these items with the city's initial scope in mind,but will • Coordination with public works staff to review sanitary sewer for locations <br /> also apply our expertise to determine if there should be an of replacements, repairs,and lining <br /> extension or change in scope,or a change in methods to • Coordination with public works staff on watermain improvements and <br /> achieve the same outcome.This will be especially critical replacements <br /> when evaluating trenchless rehabilitation options for the • Location of any signing and striping <br /> city's sanitary sewer system. • Preparation of the Stormwater Pollution Prevention Plan(SWPPP), including <br /> plan sheets and specifications <br /> Bolton&Menk will prepare a technical memorandum • Preparation of traffic control and construction phasing plan with an <br /> after our detailed review of the feasibility report with our emphasis on neighborhood access during construction,especially at the <br /> recommendations on changes to the project scope and dead-end blocks <br /> methods of construction,while keeping project costs in Preparation of statement of estimated quantities, including street,utilities, <br /> mind as this is critical to the city council and the public.We and miscellaneous construction items,all consistent with the city's <br /> will review this memo with city staff to determine the final standard specifications and specifically,the city's method of measurement <br /> scope of the project and proceed with the assurance we are and payment <br /> building a project that will last. <br /> Stormwater management and erosion control design will <br /> Prior to final design,private utilities within the project areas meet RCWD permitting requirements.Upon competition <br /> will be identified.We will identify utilities that may pose of final plans,we will submit all required information to <br /> risks to the project schedule and/or budget and coordinate RCWD for approval. <br /> with the appropriate utility owners to protect or relocate <br /> their utilities if needed.We will conduct one private utility <br /> coordination meeting during the early stages of design. <br /> 2021 Hazelnut Park/Glenpaul Neighborhood Street and Utility Improvements I City of Arden Hills, Minnesota <br />