My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-10-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:20:15 AM
Creation date
9/8/2020 4:14:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding and Approach <br /> Task 8: Bidding Assistance Bolton&Menk can provide that level of service,with the <br /> Bolton&Menk will prepare the advertisement for bids approval of the city,for the additional hours needed at the <br /> for the city to send to required publications.We will hourly rate provided in our Summary of Fees table. <br /> also provide plans and specifications for electronic <br /> We are proposing to use an E.I.T.with similar project <br /> distribution to Quest CDN by the city. <br /> experience for construction observation on the project. <br /> Bolton&Menk will answer all written and verbal Our construction observer will ensure the contractor <br /> questions from potential bidders. If necessary,we will is following the project plans and specifications <br /> issue addenda to address project-related questions and incorporating this information into building the <br /> during bidding. streets and utilities.This individual will also handle <br /> communication and questions from residents,and they <br /> We will attend the bid opening,tabulate bids, and prepare will relay information between the contractor and the city <br /> the letter of award recommendation. as necessary. <br /> Bolton&Menk's construction observer will ensure each <br /> Task 9: Construction Administration resident's needs are met throughout the difficulties of <br /> Bolton&Menk will assist the city through the construction.Within our scope of services,we anticipate <br /> construction phase by providing construction a moderate amount of interaction with the majority of <br /> management,administration, and observation services. residents at some point during the project.This includes <br /> providing updates and notices as necessary for water <br /> Bolton&Menk will plan and lead the project's pre- shutdowns and access restrictions,making sure residents <br /> construction meeting and review shop drawings as they have access when possible and when needed,and <br /> are submitted by the contractor. Our survey crew will responding to commonly-asked questions and requests <br /> complete the following tasks during construction: during the construction process.They will also coordinate <br /> • Control verification materials testing with a testing agency provided by the city <br /> • Staking sanitary sewer(assume only one structure,the rest of the and prepare punch lists after a final project inspection. <br /> castings will be adjusted with the pipe runs being lined) <br /> • Staking water(assume 11 hydrants and 6 gate valves and pipe runs Nick Amatuccio will provide direct oversight to our <br /> within full reconstruction areas) observer in the field. It is anticipated that Nick will <br /> • Staking storm sewer(assume 30 structures and pipe runs which spend approximately 10 hours per week on construction <br /> includes all proposed storm in options 1 and 2) manager responsibilities.He will conduct weekly <br /> • Staking curb for both proposed and optional curb areas construction meetings with the contractor and prepare <br /> progress payments monthly and change order documents <br /> We will provide on-site construction observation as necessary. <br /> throughout the project. Our scope of services assumes <br /> construction will take approximately 26 weeks. Bolton &Menk will survey the final improvements and <br /> We propose to have a construction observer on-site prepare record drawings in electronic format.All final <br /> throughout construction. It is expected that full-time project documents will be conveyed to the city in a form <br /> observation, 50 hours per week,will be needed during compatible with AutoCad Civ113D and in a final PDF <br /> utility construction and part-time observation,25 hours record plan set. <br /> per week,will be needed during street construction. <br /> These assumptions are based on the minimum amount As-built of structures will include <br /> of time and effort to inspect work throughout the • Horizontal location and rim elevations of all structures which castings were <br /> construction season.The hours do not account for items only adjusted(sanitary,storm,and water including hydrants and valves) <br /> outside of Bolton&Menk's control and it is possible . Horizontal location,rim,and inverts of fully replaced and built structures <br /> that a higher level of service will be needed. If full-time (sanitary,storm,and water such as hydrants and valves) <br /> inspection is needed throughout construction and the • Top nut hydrants for benchmarks <br /> hours and/or duration need to increase from our estimate, <br /> 2021 Hazelnut Park/GAW�LNeigN Street and Utility . . of-Arden <br />
The URL can be used to link to this page
Your browser does not support the video tag.