My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-10-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:20:15 AM
Creation date
9/8/2020 4:14:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding and Approach O <br /> For linear projects,RCWD currently requires stormwater We will provide specification submittals at 60%and 90% <br /> quality and volume control practices for the increase in for city review,prior to submitting the final specifications <br /> impervious area only.The current requirement is 0.75 for bidding. Three final paper copies and a PDF digital <br /> inches over the newly constructed impervious area.These copy of the plans and specifications will be provided to the <br /> standards are subject to change and potential changes to the city for bidding. <br /> rules should be considered during design of this project; <br /> however,we cannot anticipate what these changes might Task 7: Public Engagement <br /> entail and will have to scope our services based on the Bolton&Menk will engage the public and provide a forum <br /> current standards.The potential drainage impacts should for valuable project discussion.We will work with city <br /> be communicated with RCWD early and often during the staff to hold one public informational meeting during the <br /> project to ensure any potential rule changes are considered design process to identify key project issues and concerns <br /> during the final permit submittals. Our scope of services from residents and businesses.This information will be <br /> assumes the project will result in less than 10,000 square incorporated into the design. Depending on neighborhood <br /> feet of new impervious,which will not require design of feedback,it may be necessary to hold more than one public <br /> volume control,water quality,and rate control practices.We informational meeting prior to finalizing the plans. Items <br /> anticipate the project will result in about 6,000 square feet of like adding curb and gutter where there is no existing curb <br /> additional impervious based on the added curb and gutter can be controversial with some residents and it may take <br /> throughout the neighborhood. more time to work through their concerns.However,our <br /> scope of services will only assume one meeting per the <br /> Bolton&Menk will provide plan submittals at 60%and RFR We expect these meetings will be virtual through <br /> 90%for city review prior to submitting the final plans Zoom,Microsoft Teams,online videos,or PowerPoints <br /> for bidding. with voiceovers.However,we are prepared to hold in- <br /> person meetings depending on the evolving guidelines <br /> Using past bid information from the City of Arden for COVID-19. <br /> Hills and other nearby metro communities—as well as <br /> current contractor pricing,overall city knowledge,local Individual resident meetings may be needed during the <br /> contractors, and site conditions—we will prepare an design phase to go over specific questions and concerns <br /> opinion of probable construction cost. Electronic and hard resident may have,and items the project team will need <br /> copies of the opinion of probable cost will be provided to to address in the project design.These meetings are not <br /> the city and be used for bidding and assessment purposes. included in our scope of services,but Sarah Lloyd or <br /> Nick Amatuccio are prepared to complete these meetings, <br /> We will prepare permit applications, secure city signature, as necessary.We anticipate 10 to 20 individual resident <br /> and submit to governing agencies including the Minnesota meetings at 1 to 2 hours per meeting depending on if they <br /> Department of Health,RCWD,Ramsey County right-of- are in-person or virtual. <br /> way,and the MPCA for the NPDES stormwater permit. <br /> Permit fees will be paid for by the city. Bolton&Menk will also hold a meeting with the city <br /> and the public prior to the start of construction,which <br /> An MPCA construction stormwater permit will be will focus on the construction process, schedule,access, <br /> submitted based on disturbed area,newly constructed and impacts. It will be critical to have a higher level of <br /> impervious surface, and erosion and sediment control communication with residents that live on dead-end blocks <br /> plans. It is assumed Bolton&Menk staff will submit to set expectations for access early before the project <br /> the permit application on behalf of the city and selected begins. It will also be important to create a phasing plan to <br /> contractor prior to the start of construction. provide the best access possible for dead-end blocks. <br /> Task 6: Project Man u a l/S p e c i f i c a t i o n s Our communication specialist will provide updates to a <br /> Bolton&Menk will work with city staff to prepare project website,either created and managed by our team <br /> the project manual and specifications for bidding and or one created by the city.They will also prepare monthly <br /> construction purposes. Documents will include newsletters with Nick Amatuccio to send to residents <br /> • Standard front-end documents provided by the city and edited by Bolton& during construction.Keeping the public informed of what is <br /> Menk for project specifics happening on the project leads to successful communication, <br /> • Special provisions and technical specifications for project-specific items which ultimately leads to a successful project. <br /> of work <br /> 2021 Hazelnut Park/Glenpaul Neighborhood Street and Utility Improvements I City of Arden Hills, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.