Hazelnut Park/Glenpaul Neighborhood Street&Utility Improvements <br /> Proposal Amendment <br /> even breaks ground. Unforeseen conditions will undoubtedly arise on reconstruction projects,but <br /> Nick and the Construction Observer will be able to respond to any situation and will take a <br /> proactive approach instead of reactive whenever possible. <br /> 3. Nick Amatuccio will be our Sr. Design Engineer on this project. I am excited to have Nick be a <br /> part of this project,he brings valuable experience to the design,public engagement, and <br /> construction phases of the project.Nick will be a part of this project from the kick-off meeting <br /> through the design and bidding phase, and he will lead our construction team including <br /> coordinating the preconstruction meeting,preparing pay requests, and completing the final walk- <br /> thru and close-out for the project.Nick will work with various City Staff,residents,contractors, <br /> other public agencies,and his own project team to meet the goals of the City and deliver a <br /> successful project for all parties. <br /> 4. Miranda Etienne will be designated as the Design Engineer for this project(resume included). <br /> Miranda is an E.I.T.with 3+years of experience in both construction and design.Her <br /> construction experience makes her a stronger designer as she understands what it takes to build <br /> the project in the field.Miranda was the lead designer on the 2019 Hopkins Street&Utility <br /> Improvements project with oversight from Nick Amatuccio as the Project Engineer. This project <br /> had several similarities to the Hazelnut Park project including residential street reconstruction, <br /> spot utility replacements, and the addition of curb and gutter on some blocks where there was <br /> none previously. <br /> 5. Our Environmental Engineer,Brian Guldan,will evaluate the existing 6-inch diameter force main <br /> to make sure the current size is adequate for the current operations of the lift station and to see if a <br /> smaller diameter pipe would be adequate after a lining operation. We are estimating this <br /> evaluation to be 8 hours,assuming the City provides the lift station data and no field investigation <br /> is required. If determined that a liner is feasible for the existing force main,our Trenchless <br /> Engineer,Mitch Hoeft,will provide the design necessary for the pressure-rated liner. <br /> The work scope updates noted above modify our overall fees: <br /> Task 9: Construction Services ($25,248) <br /> Task 4: Design Analysis—Evaluate Forcemain $ 1,368 <br /> TOTAL Project Fee Reduction ($23,880) <br /> We look forward to working with the City on the Hazelnut Park/Glenpaul Neighborhood Street&Utility <br /> Improvement project. If you have any questions regarding this proposal amendment,please do not <br /> hesitate to call. <br /> Sincerely, <br /> sBolton & Mcnnk, Inc.2�ktaJ4;- <br /> p� <br /> Sarah E.Lloyd,P.E. <br /> Principal Engineer <br /> Bolton&Menk is an equal opportunity employer. <br />