Laserfiche WebLink
■ Schedule D, through routine storm sewer inspections, Public Works staff has identified <br /> four catch basins that must be repaired due to the structures failing. <br /> The City received two bids from the five contractors receiving the bid solicitation. Two <br /> contractors declined due to current work load and one contractor did not respond. Staff <br /> recommends that the City award the work to Klein Underground LLC, the low bidder for the <br /> work. Klein has successfully complete concrete repair work for the City in the past. <br /> Budget Impact <br /> The 2020 Operating Budget for the Surface Water Management Fund includes funding for <br /> repairs to drainage assets, including curbs and catch basins in the amount of$65,000 under 604- <br /> 49550-44030. All work items included in this project are associated with surface drainage or <br /> subsurface water causing heaving and damage to flatwork. <br /> Staff intends to also use this contract to repair seven additional catch basins and approximately <br /> 132 feet of damaged curb within the 2020 street overlay project. The contractor has indicated <br /> that they will perform this additional work at the contract bid prices. <br /> Schedule A, B, C and D Concrete Repairs $27,824.50 <br /> 2020 Overlay Concrete Repairs $25,983.00 <br /> Total Cost $53,807.50 <br /> Attachments <br /> Attachment A: Bid Tabulation <br /> Attachment B: Project Location Maps <br /> Attachment C: Construction Contract <br /> Page 2 of 2 <br />