My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Todd Blomstrom <br /> Trunk Watermain Condition Assessment <br /> August 18, 2020 <br /> Page 3 <br /> TKDA will advise the City if circumstances develop beyond our control that will impact the schedule <br /> outlined in this Proposal. <br /> VI. COMPENSATION <br /> Compensation for services provided as described in SECTION II shall be on an Hourly Time and <br /> Materials basis in accordance with our Contract in an amount not to exceed $29,400, as shown in the <br /> attached fee estimate. An allowance of$5,000 for subcontracting of a geotechnical investigation has <br /> been included. TKDA will inform the City if the actual costs will exceed this amount once the work is <br /> better defined by the desktop evaluation. <br /> The level of effort required to accomplish SECTION II services can be affected by factors which are <br /> beyond our control. Therefore, if it appears at any time that charges for services rendered under <br /> SECTION 11 will exceed the above, we agree that we will not perform services or incur costs which will <br /> result in billings in excess of such amount until we have been advised by you that additional funds are <br /> available and our work can proceed. <br /> VI l 1. CONTRACTUAL INTENT <br /> We thank you for the opportunity to submit this Proposal. We agree that this Proposal and attachments <br /> constitute a contract between us upon its signature by an authorized official of The City of Arden Hills <br /> and the return of a signed copy to us, or your issuance of a Work Order referencing this letter and <br /> attachments as our authorization to proceed. This Proposal will be open for acceptance for 30 days, <br /> unless the provisions are changed by us in writing prior to that time. <br /> erely, <br /> Daniel A. Nester, E 4o4uglas W. Fischer, PE <br /> Project Manager Vice President, Municipal Services <br /> DAN:DWF:ksb:sfs <br /> ATTACHMENTS: PROJECT FEE ESTIMATE <br /> EXHIBIT A, WATER MAIN LOCATION MAP <br /> GENERAL PROVISIONS <br /> c: Larry Poppler, TKDA <br /> ACCEPTED FOR THE CITY OF ARDEN HILLS, MINNESOTA <br /> By: <br /> (signature) Printed Name/Title Date <br /> CLIENT'S DESIGNATED REPRESENTATIVE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.