My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for all three catch basins; replacement of damaged/removed median concrete; and restoring <br /> approximately 600 square yards of street pavement. <br /> Unfortunately, the repairs are located along the segment of Round Lake Road having a center <br /> median. Temporary traffic control will be required to guide both northbound and southbound <br /> traffic through the northbound lane. The temporary lane closure will extend approximately two to <br /> three days. A portable signal system is proposed to manage the lane closures during day and night <br /> hours. <br /> Staff worked with Valley Rich Company to prepare a proposal for the repairs as provided in <br /> Attachment C. Valley Rich performs water main break repairs and other urgent repair projects for <br /> the City. The estimated repair costs total $23,600. <br /> Budget Impact <br /> The 2020 Operating Budget for the Surface Water Utility includes $65,000 for repairs to drainage <br /> system infrastructure. To date, storm sewer repair work for the 2020 street overlay and the 2020 <br /> concrete repairs has encumbered approximately $53,800 of the repair funds. Approximately <br /> $11,200 remains available for the proposed storm sewer repairs along Round Lake Road. The <br /> recommended repairs would exceed the budget line item by $12,400.00. The 2020 budget also <br /> includes $25,000 for repairs & maintenance — equipment of which nothing has been spent to date. <br /> Staff is proposing to utilize $12,400 of this amount to cover the balance of the project costs. <br /> Attachments <br /> Attachment A: Location Map <br /> Attachment B: Photos of Existing Conditions <br /> Attachment C: Proposal from Valley Rich <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.