My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dated August 8, 2020, which plans and specifications are provided in Exhibit"C" and are on file with the <br /> City. <br /> 3. The final concrete curb, sidewalk, curb ramps, pavement markings, and pavement work <br /> shall be installed before November 17, 2020. The signal system shall be installed and fully functional <br /> before February 15, 2021. The Developer may, however, request an extension of time from the City. If <br /> an extension is granted, it shall be conditioned upon updating the security posted by the Developer to <br /> reflect cost increases and the extended completion date. Final wear course placement must have the <br /> written approval of the City Engineer, and may be delayed or scheduled at any time of the year based <br /> upon existing site conditions at the discretion of the City Engineer. <br /> 4. The Developer warrants all Improvements required to be constructed by it pursuant to this <br /> Agreement for a period of twenty-four(24) months from the date of acceptance by the City against poor <br /> material and faulty workmanship. <br /> 5. The Developer shall pay all costs incurred pursuant to the Engineer's Opinion of Probable <br /> Construction Costs for Lake Valentine Road Improvements dated July 31, 2020, on file with the City, <br /> which costs estimates may change as the Improvements are installed. The Developer agrees to pay any <br /> costs incurred by the City, less the cash requirement previously paid of$40,054.00 for the Lake Valentine <br /> Road Improvement Study, in conjunction with the installation, construction, and perpetual operation and <br /> maintenance of the Improvements, including but not limited to legal, planning, engineering and inspection <br /> expenses incurred in connection with approval and acceptance of the Improvements, the preparation of this <br /> Agreement, review of construction plans and documents, all costs and expenses incurred by the City in <br /> monitoring and inspecting the installation and construction of the Improvements, and electrical service and <br /> repair costs for the signal system. <br /> 3 <br /> 211093v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.